Quick answers
What is this project?
Production of 2.16 KLD Mahua Flower Based Out Still Liquor Shop manufacturing unit of M/s Main Out Still Liquor Shop, Papadahandi at/mouza/Tahasil- Papadahandi, Dist.- Nabarangapur of the Licensee Sri Nalanikanta Mohanty is an approved industrial project in Paparhahandi, Paparahandi, Nabarangapur, Odisha. The site covers 0.2 acres.
Who is building it?
The applicant is Nalanikanta Mohanty.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Dec 2022), as of 27 Nov 2026.
Where is it?
In Paparhahandi, Paparahandi, Nabarangapur, Odisha.
How big is it?
It has a site of 0.2 acres.
When was it filed?
The application was filed on 2 Dec 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Dec 2022 |
| Application filed | 2 Dec 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Nalanikanta Mohanty |
| Land area | 1,000 m² |
| Village / locality | Paparhahandi |
| Taluk / tehsil | Paparahandi |
| District | Nabarangapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00105 |
In context
5 applications in Nabarangapur since January 2022 are in the same category (Industry): 2 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Paparhahandi, Paparahandi, Nabarangapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Papadahandi Stone Quarry over an area of 2.10 Acres or 0.850 Hectares having… — environmental approval granted, 1.9 km away
- Amendment in EC of Banksaragi Sand Quarry Over an area of 7.60 Acre or 3.08… — initial checks, 2.1 km away
- Banksaragi Sand Quarry Over an Area of 7.60 Acres Or 3.08 Ha Is — not approved, 2.1 km away
- Transfer of EC of Bankasargi Sand Quarry over an area of 7.60 Acres or 3.08 Ha — environmental approval granted, 2.1 km away
- Modification of Ec on the Basis of Replenishment Study Report of Bankosaragi… — environmental approval granted, 2.1 km away
- Pradhaniguda Sand Quarry, Over an area 8.20 Acres or 3.32 Hectares Bearing… — lapsed, 3.6 km away
- Gumaguda Sand Quarry Over an Area 5.36acres Or 2.17ha — not approved, 5.5 km away
- Modification of Ec on the Basis of Replenishment Study Report of Gumaguda Sand… — not approved, 5.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.