One of 2 filings for this project. The project's main page, with every filing and where each stands: 1.5MTPA Iron Ore Beneficiation Plant by M/s. FEDDERS ELECTRIC & ENGINEERING LIMITED
Project details
| Official title | Proposed Installation of 1.5MTPA Iron Ore Beneficiation Plant at village- Sanindipur, Koida, Dist.- Sundargarh, Odisha, by M/s. FEDDERS ELECTRIC & ENGINEERING LIMITED |
|---|---|
| Status | Cleared for impact study |
| Status since | 21 Oct 2023 |
| Application filed | 21 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Fedders Electric and Engineering Limited |
| Land area | 24.6 acres (10 ha) |
| Project cost | ₹98 crore |
| Village / locality | Sanaindupur |
| Taluk / tehsil | Koida |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00282 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 May 2024 | Environmental approval granted | 24.6 acres | ₹98 crore |
| Early planning filed 21 Oct 2023 (this page) | Cleared for impact study | 24.6 acres | ₹98 crore |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 24.6 acres, this one is smaller than 51% of them.
No other mining lease on record is within 500 m of this site; 22 have applied within 5 km.
Where it is
Sanaindupur, Koida, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 1.5MTPA Iron Ore Beneficiation Plant by M/s. FEDDERS ELECTRIC & ENGINEERING… — environmental approval granted, 0 m away
- Purheibahal Iron Ore Block Over An Area Of 64.337 Ha For Production Of 1.0… — environmental approval granted, 750 m away
- Environment Clearance for Enhancement in Production of Iron Ore From 8.06… — environmental approval granted, 950 m away
- Proposed Expansion of the Integrated Project of Iron Ore Beneficiation Plant… — under environmental review, 1 km away
- Enhancement in Production from total handling of 23.0635 MTPA [ROM Iron Ore:… — environmental approval granted, 1 km away
- Environment Clearance for Enhancement in Production of Iron Ore From 16.50… — environmental approval granted, 1.1 km away
- Sanindpur Iron & Mn. Ore Mines — withdrawn, 1.3 km away
- Sanindpur Iron & Mn. Mine — lapsed, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.