Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 Oct 2023 |
| Application filed | 3 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Subhlabh Cements Private Limited |
| Land area | 5 acres (2 ha) |
| Project cost | ₹9.9 crore |
| Village / locality | Mandiakudar |
| Taluk / tehsil | Rajagangapur |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00409 |
In context
57 applications in Sundargarh since January 2022 are in the same category (Industry): 17 approved, 18 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5 acres, this one is smaller than 70% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mandiakudar, Rajagangapur, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of the existing project of Rolling Mill having capacity of… — under environmental review, 0 m away
- Expansion Project for existing Capacity of Sponge iron (DRI)- 60,000 TPA to… — cleared for impact study, 800 m away
- Grant of Transfer Ec of Chungimati Sand Bed Over an Area 9.00ac Or 3.642ha — environmental approval granted, 1.1 km away
- Industrial project by Beepee Rollers Private Limited — withdrawn, 2.9 km away
- Industrial project by BeePee Rollers Pvt Ltd — lapsed, 2.9 km away
- Expansion of Coal Tar Distillation Plant to increase the production of Liquid… — cleared for impact study, 3.5 km away
- Regularization of the existing project of Rolling Mill having capacity of… — more information requested, 4 km away
- Modification of Ec on the Basis of Replenishment Study Report of Chandiposh… — environmental approval granted, 5.1 km away
More from Subhlabh Cements Private Limited in Sundargarh
- Regularization of the existing project of Rolling Mill having capacity of… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.