Quick answers
What is Greenfield project of 200 KLD Grain Based Ethanol Plant?
Greenfield project of 200 KLD Grain Based Ethanol Plant is an approved industrial project in Kandekela, Rengali, Jharsuguda, Odisha. The site covers 22.2 acres.
Who is building it?
The applicant is Energy Intro Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Apr 2023), as of 27 Nov 2026.
Where is it?
In Kandekela, Rengali, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹205 crore and a site of 22.2 acres.
When was it filed?
The application was filed on 11 Apr 2023.
Project details
| Official title | Greenfield project of 200 KLD Grain Based Ethanol Plant along with 4.5 MW Co-generation Power Plant at Village-Kandeikala, Tehsil-Lakhanpur, District- Jharsuguda, Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 11 Apr 2023 |
| Application filed | 11 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Energy Intro Private Limited |
| Land area | 22.2 acres (9 ha) |
| Project cost | ₹205 crore |
| Village / locality | Kandekela |
| Taluk / tehsil | Rengali |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00448 |
In context
38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22.2 acres, this one is smaller than 62% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kandekela, Rengali, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Semelia Stone Quarry — environmental approval granted, 850 m away
- Kanaktora Sand Bed Over an Area of 12.00acres Or 4.856 Ha Is — environmental approval granted, 11.5 km away
- Proposed Enhancement in production from 1,50,000 TPA to 3,00,000 TPA of… — environmental approval granted, 16 km away
- Proposed Enhancement in production from 1,50,000 TPA to 3,00,000 TPA of… — cleared for impact study, 16 km away
- Bhikampalli Quartzite Mines over an area of 4.897 Ha — initial checks, 16.9 km away
- Bhikampalli Quartzite Mines over an area of 4.897 Ha — environmental approval granted, 16.9 km away
- Extension EC of Basenpali Stone Quarry mine over an area of 5.56 Ha or 13.75acre — not approved, 17.4 km away
- Basenpali Stone Quarry mine over an area of 5.56 Ha or 13.75acre — environmental approval granted, 17.4 km away