What is Developing? Open the mapMap

Environmental approval grantedIndustry · Kalahandi, Odisha

Greenfield Project of "Grain Based Distillery Plant of 120 KLD by M/s NRTR Green Fuel and Energy Pvt. Ltd

Greenfield Project of "Grain Based Distillery Plant of 120 KLD by M/s NRTR Green Fuel and Energy Pvt. Ltd is an approved industrial project in Bijkhaman, Kesinga, Kalahandi, Odisha. The site covers 34.3 acres. Its stated project cost is ₹124.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 Aug 2023).

See it on the live map All projects in Kalahandi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Project of "Grain Based Distillery Plant of 120 KLD by M/s NRTR Green Fuel and Energy Pvt. Ltd is an approved industrial project in Bijkhaman, Kesinga, Kalahandi, Odisha. The site covers 34.3 acres.

Who is building it?

The applicant is Nrtr Green Fuel and Energy Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 28 Aug 2023), as of 27 Nov 2026.

Where is it?

In Bijkhaman, Kesinga, Kalahandi, Odisha.

How big is it?

It has a stated cost of ₹124.5 crore and a site of 34.3 acres.

When was it filed?

The application was filed on 4 Jul 2023.

Project details

Official titleGreenfield Project of "Grain Based Distillery Plant of 120 KLD along with Co-generation Power Plant of 3.2 MW" located at Village- Bijkhaman, Tehsil- Kesinga, District- Kalahandi, Odisha by M/s NRTR Green Fuel and Energy Pvt. Ltd.
StatusEnvironmental approval granted
Status since28 Aug 2023
Application filed4 Jul 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantNrtr Green Fuel and Energy Private Limited
Land area34.3 acres (13.9 ha)
Project cost₹124.5 crore
Village / localityBijkhaman
Taluk / tehsilKesinga
DistrictKalahandi
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00481

In context

11 applications in Kalahandi since January 2022 are in the same category (Industry): 9 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 34.3 acres, this one is larger than 64% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bijkhaman, Kesinga, Kalahandi, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.