Cleared for impact studyIndustry · Kendujhar, Odisha

Expansion of existing rolling mill (TMT Bars, Rolled product, wire Rods etc.) from 45,000 TPA to 1,05,000 TPA with existing facility for production of Sponge Iron (2,40,000 TPA), Liquid Steel/M.S Billets/Ingots with IF, LRF & CCM (1,80,000 TPA), Pig Iron through Blast Furnace (36,000 TPA), Captive Power Plant of 28 MW (WHRB based 17.7 MW & Coal & Dolochar Based 10.3 MW) and Fly ash bricks plant (5 Lakh/months) under Violation

Expansion of existing rolling mill (TMT Bars, Rolled product, wire Rods etc.) from 45,000 TPA to 1,05,000 TPA with existing facility for production of Sponge Iron (2,40,000 TPA), Liquid Steel/M.S Billets/Ingots with IF, LRF & CCM (1,80,000 TPA), Pig Iron through Blast Furnace (36,000 TPA), Captive Power Plant of 28 MW (WHRB based 17.7 MW & Coal & Dolochar Based 10.3 MW) and Fly ash bricks plant (5 Lakh/months) under Violation is a proposed industrial project in Laidapada, Rugudi, Kendujhar, Odisha. The site covers 73.8 acres. Its stated project cost is ₹467 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Nov 2023).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of existing rolling mill (TMT Bars, Rolled product, wire Rods etc.) from 45,000 TPA to 1,05,000 TPA with existing facility for production of Sponge Iron (2,40,000 TPA), Liquid Steel/M.S Billets/Ingots with IF, LRF & CCM (1,80,000 TPA), Pig Iron through Blast Furnace (36,000 TPA), Captive Power Plant of 28 MW (WHRB based 17.7 MW & Coal & Dolochar Based 10.3 MW) and Fly ash bricks plant (5 Lakh/months) under Violation is a proposed industrial project in Laidapada, Rugudi, Kendujhar, Odisha. The site covers 73.8 acres.

Who is building it?

The applicant is Sree Metaliks Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 28 Nov 2023), as of 27 Nov 2026.

Where is it?

In Laidapada, Rugudi, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹467 crore and a site of 73.8 acres.

When was it filed?

The application was filed on 10 Oct 2023.

Project details

StatusCleared for impact study
Status since28 Nov 2023
Application filed10 Oct 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSree Metaliks Limited
Land area73.8 acres (29.9 ha)
Project cost₹467 crore
Village / localityLaidapada
Taluk / tehsilRugudi
DistrictKendujhar
StateOdisha
Location fromSite area on record
Our referenceWID-OR-00489

In context

38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 73.8 acres, this one is smaller than 66% of them.

24 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Laidapada, Rugudi, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sree Metaliks Limited in Kendujhar

All 12 Sree Metaliks projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.