What is Developing? Open the mapMap

Environmental approval grantedMining · Malkangiri, Odisha

Proposed Kottameta Limestone Mine (Auctioned Block) (ML Area: 802.25 ha) with total excavation of 7.6 million TPA (Limestone Production Capacity – 3.0 Million TPA, Soil 0.5 Million TPA and Waste 4.1 Million TPA)

Proposed Kottameta Limestone Mine (Auctioned Block) (ML Area: 802.25 ha) with total excavation of 7.6 million TPA (Limestone Production Capacity – 3.0 Million TPA, Soil 0.5 Million TPA and Waste 4.1 Million TPA) is an approved mining project in Katamater, Malkangiri, Odisha. The site covers 1,982.4 acres. Its stated project cost is ₹245 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 19 May 2026).

See it on the live map All projects in Malkangiri

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed Kottameta Limestone Mine (Auctioned Block) (ML Area: 802.25 ha) with total excavation of 7.6 million TPA (Limestone Production Capacity – 3.0 Million TPA, Soil 0.5 Million TPA and Waste 4.1 Million TPA) along with 1000 TPH Crusher located at Village – Katamater, Tehsil & District – Malkangiri, Odisha by M/s. Dalmia Cement (Bharat) Ltd.
StatusEnvironmental approval granted
Status since19 May 2026
Application filed27 Sept 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantDalmia Cement (Bharat) Limited
Land area1,982.4 acres (802.3 ha)
Project cost₹245 crore
Village / localityKatamater
Taluk / tehsilMalkangiri
DistrictMalkangiri
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00591

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 10 Feb 2025Under forest review1,982.4 acres₹245 crore
New project filed 27 Sept 2023 (this page)Environmental approval granted1,982.4 acres₹245 crore

In context

77 applications in Malkangiri since January 2022 are in the same category (Mining): 42 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,982.4 acres, this one is larger than 97% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Katamater, Malkangiri, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 56 Dalmia Cement (Bharat) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.