WithdrawnPower · Dhenkanal, Odisha

Name change in EC for expansion of existing (2X150) 300 MW TPP by installation of (165+20) 185 MW coal based TPP form M/s. Angul Energy Limited to "M/s. Tata Steel Limited, TSM-CPP"

Name change in EC for expansion of existing (2X150) 300 MW TPP by installation of (165+20) 185 MW coal based TPP form M/s. Angul Energy Limited to "M/s. Tata Steel Limited, TSM-CPP" is a withdrawn power project in Shibapur, Motunga, Dhenkanal, Odisha. The site covers 100 acres. Its stated project cost is ₹1,123.3 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 9 Nov 2024).

See it on the live map All projects in Dhenkanal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusWithdrawn
Status since9 Nov 2024
Application filed7 Nov 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorPower
ApplicantAngul Energy Limited
Land area100 acres (40.5 ha)
Project cost₹1,123.3 crore
Village / localityShibapur
Taluk / tehsilMotunga
DistrictDhenkanal
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00752

In context

8 applications in Dhenkanal since January 2022 are in the same category (Power): 3 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.

24 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Shibapur, Motunga, Dhenkanal, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.