What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Cuttack, Odisha

Proposed Integrated Hospital-Cum-Hotel-Cum-Residential Apartment of 2b+g+8 Floor Hospital Block, 2b+g+11 Commercial-Cum-Hotel Building Block, Two Blocks of B+s+22 and One Block of 2b+s+27 Storied Residential Apartment Building Appended With G+3 Storied Club House Building Block and S+8 Storied Ews Building Plan for M/S. Dion Riverside Township PVT. LTD.,

Proposed Integrated Hospital-Cum-Hotel-Cum-Residential Apartment of 2b+g+8 Floor Hospital Block, 2b+g+11 Commercial-Cum-Hotel Building Block, Two Blocks of B+s+22 and One Block of 2b+s+27 Storied Residential Apartment Building Appended With G+3 Storied Club House Building Block and S+8 Storied Ews Building Plan for M/S. Dion Riverside Township PVT. LTD is an approved mixed-use project in Naranpur, Barang, Cuttack, Odisha. It plans 1,256 units in 7 towers of up to 27 floors on 12.2 acres. Its stated project cost is ₹511.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 24 Feb 2025).

See it on the live map All projects in Cuttack

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since24 Feb 2025
Application filed10 Aug 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantDion Riverside Township Private Limited
UseMixed use
Units1,256
Towers7
Floors (tallest)27
Basements2
Height86 m
Parking spaces3,231
Land area12.2 acres (4.9 ha)
Built-up area2,63,465 m² (28,35,911 sq ft)
Plot area49,309 m² (5,30,757 sq ft)
Project cost₹511.8 crore
Village / localityNaranpur
Taluk / tehsilBarang
DistrictCuttack
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00787

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 10 Aug 2024 (this page)Environmental approval granted12.2 acres₹511.8 crore
Early planning filed 4 Dec 2023Cleared for impact study12.2 acres₹511.8 crore

In context

43 applications in Cuttack since January 2022 are in the same category (Buildings & townships): 25 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 12.2 acres, this one is larger than 64% of them.

24 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Naranpur, Barang, Cuttack, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.