What is this project?
New proposed project of Bhagabanpur Stone Quarry with proposed excavation of 25000 CUM/year of stone of Sri Ranjeet Kumar Sahu having an area of 4.50 Ha. Located at Khata No. 215, Plot No. 11, At- Bhagabanpur, Tahasil- Kukudakhandi, District- Ganjam, Odisha is a withdrawn mining project in Anant|A, Digapahandi, Ganjam, Odisha. The site covers 11.1 acres.
Who is building it?
The applicant is Ranjeet Kumar Sahu.
Has it been approved?
No. The application was withdrawn on 13 Mar 2025, so it is no longer under consideration.
Where is it?
In Anant|A, Digapahandi, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹18 lakh and a site of 11.1 acres.
When was it filed?
The application was filed on 11 Oct 2024.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 13 Mar 2025 |
| Application filed | 11 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ranjeet Kumar Sahu |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹18 lakh |
| Village / locality | Anant|A |
| Taluk / tehsil | Digapahandi |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00838 |
In context
235 applications in Ganjam since January 2022 are in the same category (Mining): 134 approved, 18 filed or under review, and 83 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.1 acres, this one is smaller than 56% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 22.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Anant|A, Digapahandi, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance of Bhagabanpur Stone Quarry Over an Area of 11.12 Acres… — environmental approval granted, 100 m away
- Bhagabanpur Decorative Stone Mine over an area of 21.578 Ha (Under Cluster… — cleared for impact study, 1000 m away
- Bhagabanpur Decorative Stone Mine over an area 21.578 Ha or 53.32 Acres — not approved, 1000 m away
- Bhagabanpur Decorative Stone Mine over an area 21.578 Ha or 53.32Acres — not approved, 1000 m away
- Bhagabanpur Decorative Stone Mine over an area 21.578 Ha or 53.32Acres — withdrawn, 1000 m away
- Validity Extension of Environmental Clearance for Production of Country Liquor… — environmental approval granted, 1.2 km away
- Validity Extension of Environmental Clearance for Production of Country Liquor… — environmental approval granted, 1.2 km away
- Validity Extension of Environmental Clearance for Production of Country Liquor… — environmental approval granted, 1.2 km away
More from Ranjeet Kumar Sahu in Ganjam
- Environment Clearance of Bhagabanpur Stone Quarry Over an Area of 11.12 Acres… — environmental approval granted
About this information