Project details
| Official title | Expansion of Ferro Alloy Plant for high carbon ferro chrome production from 1,45,000 TPA (1 x 45 MVA & 1 x 33 MVA SAF) to 4,45,000 TPA (1 x 45 MVA, 1 x 33 MVA & 2 x 75 MVA SAFs), 11,800 TPA MRP along with new installation of raw material handling facility and 7,00,000 TPA Pellet & Sintering Plant at Village- Randia, P.S-Bhadrak Rural, Dist-Bhadrak, Odisha by M/s Ferro Alloys Corporation Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Sept 2024 |
| Application filed | 4 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Ferro Alloys Corporation Limited |
| Land area | 205.5 acres (83.2 ha) |
| Project cost | ₹1,372 crore |
| Village / locality | Amargadia |
| Taluk / tehsil | Bhadrak Rural |
| District | Bhadrak |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00886 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 4 Jul 2024 (this page) | Environmental approval granted | 205.5 acres | ₹1,372 crore |
| Early planning filed 31 Oct 2023 | Cleared for impact study | 205.5 acres | ₹1,372 crore |
| Early planning filed 31 Oct 2023 | Withdrawn | 205.5 acres | ₹1,372 crore |
In context
8 applications in Bhadrak since January 2022 are in the same category (Industry): 3 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amargadia, Bhadrak Rural, Bhadrak, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Ferro Alloy Plant for high carbon ferro chrome production from… — cleared for impact study, 0 m away
- Expansion of Ferro Alloy Plant for high carbon ferro chrome production from… — withdrawn, 0 m away
- Textile Park Bhadrak,Helpur — under forest review, 10.6 km away
- District Survey Report (DSR) of River Sand — returned to applicant, 10.8 km away
- Chrome Ore Beneficiation Plant With Throughput Capacity of 18,500 Tpa Within… — cleared for impact study, 10.8 km away
- Chrome Ore Beneficiation Plant With Throughput Capacity of 18,500 Tpa Within… — environmental approval granted, 10.8 km away
- Textile Park Bhadrak, Majurigadia. — under forest review, 11.3 km away
- Fresh EC of Chakrapadhi-I Sand Sairat Source over an area of 8.70 Acres or… — withdrawn, 13.5 km away
3 Ferro Alloys Corporation projects in Bhadrak
All 18 Ferro Alloys Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.