Project details
| Official title | Proposal for Modification of Ec on the Basis of Replenishment Study Report of Daldali Sand Quarry Over an Area 9.46acres Or 3.82ha in Daldali Village Under Tangarpali Tahasil of Sundargarh District Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 26 Nov 2024 |
| Application filed | 16 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Janak Patel |
| Land area | 9.4 acres (3.8 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Daldali |
| Taluk / tehsil | Bhasma |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00907 |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.4 acres, this one is smaller than 87% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Daldali, Bhasma, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Grant of Ec of Nadisuguda Sand Bed Over an Area 11.11 Acres Or 4.5 Hectares — environmental approval granted, 3.2 km away
- Modification of Ec on the Basis of Replenishment Study Report of Bhasma Sand… — environmental approval granted, 5.9 km away
- Modification of Ec on the Basis of Replenishment Study Report of Bhasma Sand… — not approved, 5.9 km away
- Grant of Transfer Ec of Remenda Sand Bed Over an Area 11.70 Acres Or 4.73… — environmental approval granted, 6.2 km away
- Modification of Ec on the Basis of Replenishment Study Report of Kainsara Sand… — lapsed, 7.9 km away
- Modification of Ec on the Basis of Replenishment Study Report of Kainsara Sand… — not approved, 7.9 km away
- Darlipali Super Thermal Power Project, Stage-II (1x800 MW) — cleared for impact study, 9.8 km away
- Darlipali Super Thermal Power Project, Stage-II (1x800 MW) — cleared for impact study, 9.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.