Project details
| Official title | Proposal for Ammendment in EC for change in method of mining from manual to semi-mechanised of Brahmani River Sand Uttarpratap Quarry(Khata No.-400 & Plot No.-1447(P)) area 4.73Ha. in vill Uttarpratap, Dharmasala Tahsil, Jajpur |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Jul 2025 |
| Application filed | 13 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Sarat Nayak |
| Land area | 11.7 acres (4.7 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Utarprat>P |
| Taluk / tehsil | Dharmasala |
| District | Jajapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00930 |
In context
214 applications in Jajapur since January 2022 are in the same category (Mining): 131 approved, 18 filed or under review, and 65 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.7 acres, this one is larger than 55% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Utarprat>P, Dharmasala, Jajapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brahmani River Sand Mirzapur Samil Basudeipur – 2 Quarry over an area of 11.00… — not approved, 1.8 km away
- Amendment of Replenishment Study to the EC of Brahmani River Sand, Mirzapur… — not approved, 1.8 km away
- For the Grant of Ec of Brahmani River Sand, Chandamohini Quarry (Khata… — environmental approval granted, 2.6 km away
- For the Grant of Ec of Brahmani River Sand, Chandamohini Quarry (Khata… — environmental approval granted, 2.6 km away
- Amendment Environment Clearance of Brahmani River Sand Bed, Lankabalisahi Over… — environmental approval granted, 3.4 km away
- Amendment Environment Clearance of Brahmani River Sand Bed, Lankabalisahi Over… — not approved, 3.4 km away
- Amendment Environment Clearance of Brahmani River Sand Bed,lankabalisahi Over… — not approved, 3.4 km away
- 400 KV DC Line from 400/220 KV Grid Sub-station, New Duburi to Proposed… — more information requested, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.