Project details
| Official title | Proposed Chrome Ore Beneficiation Plant Over an Area of 3.020 Acre With Throughput Capacity of 19,000 Tpa of M/S Nilachakra Mineral Private Limited at Suanari Village, P.O. Sapha, District Cuttack, Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 Feb 2025 |
| Application filed | 28 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nilachakra Minerals Private Limited |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹3.6 crore |
| Village / locality | Suanai |
| Taluk / tehsil | Tangi |
| District | Cuttack |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00983 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Aug 2024 (this page) | Environmental approval granted | 3 acres | ₹3.6 crore |
| Early planning filed 29 Dec 2023 | Cleared for impact study | 3 acres | ₹3.6 crore |
In context
153 applications in Cuttack since January 2022 are in the same category (Mining): 94 approved, 12 filed or under review, and 47 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3 acres, this one is smaller than 98% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Suanai, Tangi, Cuttack, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Chrome Ore Beneficiation Plant Over an Area of 3.020 Acre With… — cleared for impact study, 0 m away
- Grain and Malt Based Distillery Plant Project of 30 KLPD — lapsed, 5 km away
- Grain and Malt Based Distillery Plant Project of 30 KLPD — environmental approval granted, 5 km away
- Grain and Malt Based Distillery Plant Project of 30 KLPD — cleared for impact study, 5 km away
- Khushi Enterprises — withdrawn, 7.9 km away
- Chhotapadagaon Morrum Quarry — lapsed, 9.2 km away
- For Construction of proposed rail corridor by M/s My Home Industries Private… — forest land use approved, 9.4 km away
- New 6-lane Capital Region Ring Road (CRRR) from Gobindpur to Tangi — not approved, 10.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.