Project details
| Official title | New proposed project of Litibeda Limestone & Dolomite Mine with proposed excavation of 74360 TPA Limestone & 439468 TPA Dolomite of R.V. Enterprisers Pvt. Ltd. having over an area of 164.650 Ha. Located at Village- Litibeda, Kutura & Katanga, Tahasil- Rajgangpur, District- Sundargarh, Odisha. |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 12 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | R V Enterprisers Private Limited |
| Land area | 406.9 acres (164.7 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Kutra |
| Taluk / tehsil | Kutra |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01102 |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 406.9 acres, this one is larger than 79% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kutra, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Khatkurbahal (North) Block, ML Area: 156.43 ha) with production… — environmental approval granted, 4.6 km away
- Expansion of Khatkurbahal (North) Block, ML Area: 156.43 ha) with production… — cleared for impact study, 4.7 km away
- Amendment in Environmental Clearance in Specific Condition No. (i) of the EC… — environmental approval granted, 5.4 km away
- Proposed for change in configuration and capacity from DRI - (4x100 TPD +2x350… — initial checks, 9 km away
- Proposed for Change in configuration and capacity From DRI- (4 x 100 TPD + 2… — initial checks, 9.1 km away
- Proposed for Change in Plant Configuration and Production Capacity From Dri… — initial checks, 9.1 km away
- Expansion of Integrated Steel Plant from 0.067 to 0.378 MTPA at Unit-II,… — environmental approval granted, 9.2 km away
- Litibeda-Ranchi 4-lane access-controlled Greenfield Highway from Litibeda… — lapsed, 11 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.