Environmental approval grantedMining · Kendujhar, Odisha

Modification of Ec on the Basis of Replenishment Study Report of Rimuli Sand Quarry Over an Area 4.95ac Or 2.00hac

Modification of Ec on the Basis of Replenishment Study Report of Rimuli Sand Quarry Over an Area 4.95ac Or 2.00hac is an approved mining project in Rimuli, Champua, Kendujhar, Odisha. The site covers 4.9 acres. Its stated project cost is ₹4 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 24 May 2024).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Modification of Ec on the Basis of Replenishment Study Report of Rimuli Sand Quarry Over an Area 4.95ac Or 2.00hac is an approved mining project in Rimuli, Champua, Kendujhar, Odisha. The site covers 4.9 acres.

Who is building it?

The applicant is Tofan Kumar Brahma.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 24 May 2024), as of 27 Nov 2026.

Where is it?

In Rimuli, Champua, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹4 lakh and a site of 4.9 acres.

When was it filed?

The application was filed on 12 Feb 2024.

Project details

Official titleProposal for Modification of Ec on the Basis of Replenishment Study Report of Rimuli Sand Quarry Over an Area 4.95ac Or 2.00hac in Rimuli Village Under Champua Tahasil of Keonjhar District Odisha
StatusEnvironmental approval granted
Status since24 May 2024
Application filed12 Feb 2024
Approval soughtEnvironmental approval
Application typeAmendment
SectorMining
ApplicantTofan Kumar Brahma
Land area4.9 acres (2 ha)
Project cost₹4 lakh
Village / localityRimuli
Taluk / tehsilChampua
DistrictKendujhar
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-01343

In context

213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 92% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Rimuli, Champua, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.