What is Developing? Open the mapMap

LapsedMining · Mayurbhanj, Odisha

Enhancement of production of iron ore from 0.6 MTPA to 1.244 MTPA over an area of 618 Ha of Sulaipat Ore Mines for B.C Dagara Iron at Murumdihi, Nagalsila, Ukam and Bhitarmda Hill of Mayurbhanj District, Odisha

Enhancement of production of iron ore from 0.6 MTPA to 1.244 MTPA over an area of 618 Ha of Sulaipat Ore Mines for B.C Dagara Iron at Murumdihi, Nagalsila, Ukam and Bhitarmda Hill of Mayurbhanj District, Odisha is a lapsed mining project in Bhitaramada Hill N, Bisoi, Mayurbhanj, Odisha. The site covers 1,527.1 acres. Its stated project cost is ₹71 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Mayurbhanj

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Enhancement of production of iron ore from 0.6 MTPA to 1.244 MTPA over an area of 618 Ha of Sulaipat Ore Mines for B.C Dagara Iron at Murumdihi, Nagalsila, Ukam and Bhitarmda Hill of Mayurbhanj District, Odisha is a lapsed mining project in Bhitaramada Hill N, Bisoi, Mayurbhanj, Odisha. The site covers 1,527.1 acres.

Who is building it?

The applicant is Birat Chandra Dagara.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Bhitaramada Hill N, Bisoi, Mayurbhanj, Odisha.

How big is it?

It has a stated cost of ₹71 crore and a site of 1,527.1 acres.

When was it filed?

The application was filed on 9 May 2024.

Project details

StatusLapsed
Status since29 Oct 2024
Application filed9 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantBirat Chandra Dagara
Land area1,527.1 acres (618 ha)
Project cost₹71 crore
Village / localityBhitaramada Hill N
Taluk / tehsilBisoi
DistrictMayurbhanj
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-01721

In context

150 applications in Mayurbhanj since January 2022 are in the same category (Mining): 74 approved, 15 filed or under review, and 61 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,527.1 acres, this one is larger than 99% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Bhitaramada Hill N, Bisoi, Mayurbhanj, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.