One of 2 filings for this project. The project's main page, with every filing and where each stands: Application for Environmental Clearence of proposed construction road metals from…
Project details
| Official title | Application for Environmental Clearence of proposed construction road metals from Uppalada Stone Quarry-IV over an area of 12. 177 Acre or 4.982Ha. (Under Cluster Approach of total lease area 39.811 Ha.) in Village/ Mouza- Uppalada, Tahasil- Paralakhemundi, District- Gajapati over Khata No.- 376, Plot No.- 1724 in in favor of Sri Anni Gopal Rao. |
|---|---|
| Status | Withdrawn |
| Status since | 13 May 2025 |
| Application filed | 24 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gopal Anni |
| Land area | 12.2 acres (4.9 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Uppalada |
| Taluk / tehsil | Gurandi |
| District | Gajapati |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01724 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Mar 2024 | Environmental approval granted | 12.2 acres | ₹60 lakh |
| New project filed 24 Feb 2024 (this page) | Withdrawn | 12.2 acres | ₹60 lakh |
In context
63 applications in Gajapati since January 2022 are in the same category (Mining): 37 approved, 3 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.2 acres, this one is smaller than 63% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 76.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Uppalada, Gurandi, Gajapati, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Extension of Validity of Environmental Clearance of Uppalada… — environmental approval granted, 0 m away
- Application for Environmental Clearence of proposed construction road metals… — environmental approval granted, 0 m away
- Transfer of Ec for Mining of Road Metal From Uppalada Stone Quarry-Viii Over… — environmental approval granted, 350 m away
- Application for Environmental Clearence of proposed construction road metals… — environmental approval granted, 350 m away
- Application for Extension of Validity of Environmental Clearance of Uppalada… — environmental approval granted, 350 m away
- Application for Environmental Clearence of proposed construction road metals… — environmental approval granted, 350 m away
- Application for Environmental Clearence of proposed construction road metals… — withdrawn, 350 m away
- Application for Environmental Clearence of proposed construction road metals… — environmental approval granted, 550 m away
More from Gopal Anni in Gajapati
- Application for Extension of Validity of Environmental Clearance of Uppalada… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.