Project details
| Official title | Proposal for Amendment of EC of Sithalo Devi Sand Bed over an area of 11.20 Acres or 4.532 ha at village-Sithalo, Tahasil- Niali, District-Cuttack, Odisha of Sri. Bansidhar Swain. |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Nov 2024 |
| Application filed | 7 May 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Bansidhar Swain |
| Land area | 11.2 acres (4.5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Sithalo |
| Taluk / tehsil | Niali |
| District | Cuttack |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01738 |
In context
153 applications in Cuttack since January 2022 are in the same category (Mining): 94 approved, 12 filed or under review, and 47 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.2 acres, this one is smaller than 82% of them.
No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.
Where it is
Sithalo, Niali, Cuttack, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Polsara Kandal River Sand Quarry , Over an Area 12 Ac./4.856 Ht. — lapsed, 2.2 km away
- Polsara Kandal River Sand Quarry , Over an Area 12 Ac./4.856 Ht. — environmental approval granted, 2.2 km away
- Pahanga Kandal Sand Quarry Over 12.00 Acres Or 4.856 Hectares — environmental approval granted, 2.6 km away
- Regarding Transfer of Environment Clearance in Favour of Sri Sangramjit Nath,… — environmental approval granted, 2.6 km away
- Nati Devi River Sand over an area of 12.00 acres or 4.856 hectares bearing… — environmental approval granted, 2.9 km away
- Amendment of Replenishment Study to the Ec of Nati Devi River Sand Over an… — environmental approval granted, 2.9 km away
- 220Kv DC Line from existing 220/132/33Kv grid S/s Pratapsasan to proposed… — in-principle approval, conditions pending, 3 km away
- Submission of Replenishment Report of Badaro Devi Nadi Sand Quarry Over an… — not approved, 3.2 km away
More from Bansidhar Swain in Cuttack
- Tentulia Sand Quarry — under environmental review
- Mahanadi River Sand Quarry, Dondo Over an Area of 12.35 Acres Or 5.00 Hectares — environmental approval granted