One of 3 filings for this project. The project's main page, with every filing and where each stands: Application of Tor for Mining of Sand From Bathava Sand Quarry About an Area of 12.988…
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Sept 2026 |
| Application filed | 5 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Manoj Behera |
| Land area | 12.9 acres (5.2 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Batava |
| Taluk / tehsil | Kasinagar |
| District | Gajapati |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02398 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 28 Oct 2025 | Lapsed | 12.9 acres | ₹50 lakh |
| Amendment filed 5 Sept 2025 (this page) | Lapsed | 12.9 acres | ₹50 lakh |
| Early planning filed 15 Feb 2025 | Cleared for impact study | 12.9 acres | ₹50 lakh |
In context
63 applications in Gajapati since January 2022 are in the same category (Mining): 37 approved, 3 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.9 acres, this one is smaller than 58% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Batava, Kasinagar, Gajapati, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application of Tor for Mining of Sand From Bathava Sand Quarry About an Area… — lapsed, 0 m away
- Application of Tor for Mining of Sand From Bathava Sand Quarry About an Area… — cleared for impact study, 0 m away
- Budura Sand Bed over an area of 14.826 acres or 6.00 hectares bearing Khata… — lapsed, 1.7 km away
- Budura Sand Bed over an area of 14.826 acres or 6.00 hectares bearing Khata… — not approved, 1.7 km away
- Amendment of Environmental Clearence of Idudi Sand Bed-II (River- Bansadhara)… — environmental approval granted, 3.3 km away
- Amendment of Environmental Clearence of Idudi Sand Bed-II (River- Bansadhara)… — not approved, 3.3 km away
- Amendment of Environmental Clearence of Idudi Sand Bed-I (River- Bansadhara)… — environmental approval granted, 4 km away
- Amendment of Environmental Clearence of Idudi Sand Bed-I (River- Bansadhara)… — not approved, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.