One of 2 filings for this project. The project's main page, with every filing and where each stands: Kalamishree-Jayantpur Sand Quarry (Chitritpala River) Over an area of 12.00 Acre or 4.86…
Project details
| Official title | Kalamishree-Jayantpur Sand Quarry (Chitritpala River) Over an area of 12.00 Acre or 4.86 Ha. in Village- Kalamishree-Jayantpur under Nischintakoili Tahasil of Cuttack District, Odisha |
|---|---|
| Status | Not approved |
| Status since | 22 Jun 2025 |
| Application filed | 12 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Kishore Muduli |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹14 lakh |
| Village / locality | Kalamasirjayantapur |
| Taluk / tehsil | Nemalo |
| District | Cuttack |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02440 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 24 Jun 2025 | Environmental approval granted | 12.4 acres | ₹20 lakh |
| Amendment filed 12 Mar 2025 (this page) | Not approved | 12.4 acres | ₹14 lakh |
In context
153 applications in Cuttack since January 2022 are in the same category (Mining): 94 approved, 12 filed or under review, and 47 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.4 acres, this one is smaller than 60% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Kalamasirjayantapur, Nemalo, Cuttack, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kalamishree-Jayantpur Sand Quarry (Chitritpala River) Over an area of 12.00… — environmental approval granted, 0 m away
- Chitroptala River Sand Bed, Santapur over an area of 12.355 acres 5.00 hectares — environmental approval granted, 3.9 km away
- Submission of Replenishment Study Report and Compliance Report of Environment… — environmental approval granted, 3.9 km away
- New Proposal for Amendment Ec of Demando Sand Quarry(Luna River) Over an Area… — lapsed, 4.1 km away
- Mahanadi River Sand Quarry, Dondo Over an Area of 12.35 Acres Or 5.00 Hectares — environmental approval granted, 4.9 km away
- Submission of Replenishment Study Report for Grant of Amendment of EC of… — environmental approval granted, 4.9 km away
- Purunahat Mahanadi Sand Quarry, over an area of 12.355 acres or 5.0 Hectares — environmental approval granted, 4.9 km away
- Fresh EC of Udeypur Mahanadi Sand Bed over an area of 5.00 Ha having Khata… — environmental approval granted, 5.3 km away
More from Kishore Muduli in Cuttack
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.