What is Developing? Open the mapMap

Environmental approval grantedIndustry · Ganjam, Odisha

Validity Extension of Environmental Clearance for Production of Country Liquor From Manufacturing Unit of M/S C. Saradhapur O.S. Shop of Sri Shyam Sundar Sahu .

Validity Extension of Environmental Clearance for Production of Country Liquor From Manufacturing Unit of M/S C. Saradhapur O.S. Shop of Sri Shyam Sundar Sahu is an approved industrial project in Saradhapur, Jarada, Ganjam, Odisha. The site covers 0.7 acres. Its stated project cost is ₹10 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 18 Aug 2025).

See it on the live map All projects in Ganjam

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Validity Extension of Environmental Clearance for Production of Country Liquor From Manufacturing Unit of M/S C. Saradhapur O.S. Shop of Sri Shyam Sundar Sahu is an approved industrial project in Saradhapur, Jarada, Ganjam, Odisha. The site covers 0.7 acres.

Who is building it?

The applicant is Shyam Sundar Sahu.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 18 Aug 2025), as of 27 Nov 2026.

Where is it?

In Saradhapur, Jarada, Ganjam, Odisha.

How big is it?

It has a stated cost of ₹10 lakh and a site of 0.7 acres.

When was it filed?

The application was filed on 13 Jun 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Validity Extension of Environmental Clearance for Production of Country Liquor From…

Project details

StatusEnvironmental approval granted
Status since18 Aug 2025
Application filed13 Jun 2025
Approval soughtEnvironmental approval
Application typeValidity extension
SectorIndustry
ApplicantShyam Sundar Sahu
Land area2,800 m²
Project cost₹10 lakh
Village / localitySaradhapur
Taluk / tehsilJarada
DistrictGanjam
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-02486

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Validity extension filed 28 Mar 2026Environmental approval granted0.7 acres₹15 lakh
Validity extension filed 13 Jun 2025 (this page)Environmental approval granted0.7 acres₹10 lakh

In context

188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.7 acres, this one is larger than 68% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Saradhapur, Jarada, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.