What is Developing? Open the mapMap

Environmental approval grantedIndustry · Ganjam, Odisha

Application for validity extension of Environmental Clearance for production 0.6KLD Mahua Flower Based Country Liquor Manufacturing Unit M/s Jagannathprasad Main Out Still Shop At/Ps- Jagannathprasad, Dist- Ganjam in favour of Jogendra Prasad

Application for validity extension of Environmental Clearance for production 0.6KLD Mahua Flower Based Country Liquor Manufacturing Unit M/s Jagannathprasad Main Out Still Shop At/Ps- Jagannathprasad, Dist- Ganjam in favour of Jogendra Prasad is an approved industrial project in Jagannath Prasad, Ganjam, Odisha. The site covers 0 acres. Its stated project cost is ₹15 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 27 Mar 2025).

See it on the live map All projects in Ganjam

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Application for validity extension of Environmental Clearance for production 0.6KLD Mahua Flower Based Country Liquor Manufacturing Unit M/s Jagannathprasad Main Out Still Shop At/Ps- Jagannathprasad, Dist- Ganjam in favour of Jogendra Prasad is an approved industrial project in Jagannath Prasad, Ganjam, Odisha. The site covers 0 acres.

Who is building it?

The applicant is Jogendra Prasad.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 27 Mar 2025), as of 27 Nov 2026.

Where is it?

In Jagannath Prasad, Ganjam, Odisha.

How big is it?

It has a stated cost of ₹15 lakh and a site of 0 acres.

When was it filed?

The application was filed on 2 Mar 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Application for validity extension of Environmental Clearance for production 0.6KLD…

Project details

StatusEnvironmental approval granted
Status since27 Mar 2025
Application filed2 Mar 2025
Approval soughtEnvironmental approval
Application typeValidity extension
SectorIndustry
ApplicantJogendra Prasad
Land area200 m²
Project cost₹15 lakh
Village / localityJagannath Prasad
Taluk / tehsilJagannath Prasad
DistrictGanjam
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-02614

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Validity extension filed 29 Aug 2025Environmental approval granted1.2 acres₹15 lakh
Validity extension filed 2 Mar 2025 (this page)Environmental approval granted0 acres₹15 lakh

In context

188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0 acres, this one is smaller than 95% of them.

Where it is

Jagannath Prasad, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.