What is Developing? Open the mapMap

Environmental approval grantedIndustry · Anugul, Odisha

Application for Extension of validity of 0.636 KLD mahua flower based country liquor manufacturing unit, M/s Govindapur Main Out Still Shop, at- Govindapur, Tahasil- Sorada, Dist.-Ganjam in favor of Sri Sanjay Prasad.

Application for Extension of validity of 0.636 KLD mahua flower based country liquor manufacturing unit, M/s Govindapur Main Out Still Shop, at- Govindapur, Tahasil- Sorada, Dist.-Ganjam in favor of Sri Sanjay Prasad is an approved industrial project in Kampala, Athmallik, Anugul, Odisha. The site covers 0.4 acres. Its stated project cost is ₹17 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 15 Oct 2025).

See it on the live map All projects in Anugul

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Application for Extension of validity of 0.636 KLD mahua flower based country liquor manufacturing unit, M/s Govindapur Main Out Still Shop, at- Govindapur, Tahasil- Sorada, Dist.-Ganjam in favor of Sri Sanjay Prasad is an approved industrial project in Kampala, Athmallik, Anugul, Odisha. The site covers 0.4 acres.

Who is building it?

The applicant is Sanjaya Prasad.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 15 Oct 2025), as of 27 Nov 2026.

Where is it?

In Kampala, Athmallik, Anugul, Odisha.

How big is it?

It has a stated cost of ₹17 lakh and a site of 0.4 acres.

When was it filed?

The application was filed on 30 Aug 2025.

Project details

StatusEnvironmental approval granted
Status since15 Oct 2025
Application filed30 Aug 2025
Approval soughtEnvironmental approval
Application typeValidity extension
SectorIndustry
ApplicantSanjaya Prasad
Land area1,500 m²
Project cost₹17 lakh
Village / localityKampala
Taluk / tehsilAthmallik
DistrictAnugul
StateOdisha
Location fromSite area on record
Our referenceWID-OR-02623

In context

17 applications in Anugul since January 2022 are in the same category (Industry): 11 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.4 acres, this one is smaller than 88% of them.

Where it is

Kampala, Athmallik, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.