Quick answers
What is this project?
Proposed Iron ore beneficiation plant of M/s Shree Sindhuja Steels private Limited over an area of 7.0 Acres At: Nayagarh, Po Dubuna, Dist: Keonjhar, Odisha is a proposed mining project in Nay>Gada, Bamebari, Kendujhar, Odisha. The site covers 7 acres.
Who is building it?
The applicant is Shree Sindhuja Steel Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 4 Sept 2025), as of 27 Nov 2026.
Where is it?
In Nay>Gada, Bamebari, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹8.7 crore and a site of 7 acres.
When was it filed?
The application was filed on 18 Jun 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 4 Sept 2025 |
| Application filed | 18 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shree Sindhuja Steel Private Limited |
| Land area | 7 acres (2.8 ha) |
| Project cost | ₹8.7 crore |
| Village / locality | Nay>Gada |
| Taluk / tehsil | Bamebari |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02639 |
In context
213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7 acres, this one is smaller than 86% of them.
No other mining lease on record is within 500 m of this site; 12 have applied within 5 km.
Where it is
Nay>Gada, Bamebari, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nayagarh Iron Ore Mines — forest land use approved, 750 m away
- Nayagarh Iron Ore Mines — environmental approval granted, 750 m away
- Nayagarh Iron Ore Mines of Kc Pradhan — lapsed, 800 m away
- Nayagarh Iron Ore Mines of Kc Pradhan — lapsed, 800 m away
- Katupali Iron Ore Block — lapsed, 1.1 km away
- Preparation of Proposed Approach Road From Unchabali Iron & Manganese Mines of… — lapsed, 1.3 km away
- BHJ/BHQ Beneficiation Plant of 4 MTPA Throughput Capacity in Unchabali Iron… — cleared for impact study, 1.3 km away
- Application for Change in Land Use Pattern Over an Area of 43.281 Ha. From… — not approved, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.