Environmental approval grantedBuildings & townships · Ganjam, Odisha

Proposed environmental clearance for industrial building having production capacity of 1.2 GW solar cells and 1 GW Solar PV Module unit located at Plot No. DLSZ - 04, Domestic Tariff Area, Gopalpur Industrial Park (TATA STEEL SEZ), Chamakhandi, Chatrapur, Dist. - Ganjam, State - Odisha over total plot area of 30 Ac. and total built up area of 48,393 Sqm. by M/s Luminous Power Technologies Private Limited

Proposed environmental clearance for industrial building having production capacity of 1.2 GW solar cells and 1 GW Solar PV Module unit located at Plot No. DLSZ - 04, Domestic Tariff Area, Gopalpur Industrial Park (TATA STEEL SEZ), Chamakhandi, Chatrapur, Dist. - Ganjam, State - Odisha over total plot area of 30 Ac. and total built up area of 48,393 Sqm. by M/s Luminous Power Technologies Private Limited is an approved industrial building project in Badapur, Gopalpur, Ganjam, Odisha. The site covers 30 acres. Its stated project cost is ₹950 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 5 Mar 2026).

See it on the live map All projects in Ganjam

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed environmental clearance for industrial building having production capacity of 1.2 GW solar cells and 1 GW Solar PV Module unit located at Plot No. DLSZ - 04, Domestic Tariff Area, Gopalpur Industrial Park (TATA STEEL SEZ), Chamakhandi, Chatrapur, Dist. - Ganjam, State - Odisha over total plot area of 30 Ac. and total built up area of 48,393 Sqm. by M/s Luminous Power Technologies Private Limited is an approved industrial building project in Badapur, Gopalpur, Ganjam, Odisha. The site covers 30 acres.

Who is building it?

The applicant is Luminous Power Technologies Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 5 Mar 2026), as of 27 Nov 2026.

Where is it?

In Badapur, Gopalpur, Ganjam, Odisha.

How big is it?

It has a stated cost of ₹950 crore and a site of 30 acres.

When was it filed?

The application was filed on 11 Oct 2025.

Project details

StatusEnvironmental approval granted
Status since5 Mar 2026
Application filed11 Oct 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantLuminous Power Technologies Private Limited
UseIndustrial
Land area30 acres (12.1 ha)
Built-up area48,393 m² (5,20,897 sq ft)
Plot area1,21,423 m² (13,06,985 sq ft)
Project cost₹950 crore
Village / localityBadapur
Taluk / tehsilGopalpur
DistrictGanjam
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-03002

In context

23 applications in Ganjam since January 2022 are in the same category (Buildings & townships): 16 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 30 acres, this one is larger than 57% of them.

43 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Badapur, Gopalpur, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.