What is Developing? Open the mapMap

Not approvedIndustry · Ganjam, Odisha

Application for Extension of validity of Environmental Clearance for Production of 0.948 KLD Mahua Flower Based Out still Country Liquor Manufacturing unit of M/s Kalasandhapur Main Out Still Liquor Shop At/ Po/Ps- Hinjilicut, District- Ganjam of the Licensee Smt. Kalia Sethi.

Application for Extension of validity of Environmental Clearance for Production of 0.948 KLD Mahua Flower Based Out still Country Liquor Manufacturing unit of M/s Kalasandhapur Main Out Still Liquor Shop At/ Po/Ps- Hinjilicut, District- Ganjam of the Licensee Smt. Kalia Sethi is a rejected industrial project in Hinjillikatu Town, Hinjili, Ganjam, Odisha. The site covers 0.3 acres. Its stated project cost is ₹20 lakh. As of 27 Nov 2026, its status is “Not approved” (since 22 Sept 2025).

See it on the live map All projects in Ganjam

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Application for Extension of validity of Environmental Clearance for Production of 0.948 KLD Mahua Flower Based Out still Country Liquor Manufacturing unit of M/s Kalasandhapur Main Out Still Liquor Shop At/ Po/Ps- Hinjilicut, District- Ganjam of the Licensee Smt. Kalia Sethi is a rejected industrial project in Hinjillikatu Town, Hinjili, Ganjam, Odisha. The site covers 0.3 acres.

Who is building it?

The applicant is Kalia Sethi.

Has it been approved?

No. The application was rejected on 22 Sept 2025.

Where is it?

In Hinjillikatu Town, Hinjili, Ganjam, Odisha.

How big is it?

It has a stated cost of ₹20 lakh and a site of 0.3 acres.

When was it filed?

The application was filed on 10 Sept 2025.

Project details

StatusNot approved
Status since22 Sept 2025
Application filed10 Sept 2025
Approval soughtEnvironmental approval
Application typeValidity extension
SectorIndustry
ApplicantKalia Sethi
Land area1,300 m²
Project cost₹20 lakh
Village / localityHinjillikatu Town
Taluk / tehsilHinjili
DistrictGanjam
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-03166

In context

188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.3 acres, this one is smaller than 70% of them.

17 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hinjillikatu Town, Hinjili, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Kalia Sethi in Ganjam

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.