Quick answers
What is this project?
Proposed 40,000 TPA Titanium Dioxide Pigment plant by M/s. Shri Bajrang Power & Metallics Limited is an approved industrial project in Sahaspur, Begunia, Khordha, Odisha. The site covers 336.2 acres.
Who is building it?
The applicant is Shri Bajrang Power and Metallics Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Aug 2026), as of 27 Nov 2026.
Where is it?
In Sahaspur, Begunia, Khordha, Odisha.
How big is it?
It has a stated cost of ₹1,275 crore and a site of 336.2 acres.
When was it filed?
The application was filed on 3 Jul 2026.
Project details
| Official title | Proposed 40,000 TPA Titanium Dioxide Pigment plant along with Sulphuric Acid plant (1,20,000 TPA), Producer Gas plant (16,000 Nm3/Hr), Brick plant (40,000 Bricks/day) & Cogeneration power plant (12.75 MW) at Village Sahaspur, Tehsil Bolagarh, District Khorda, Odisha by M/s. Shri Bajrang Power & Metallics Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 7 Aug 2026 |
| Application filed | 3 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Shri Bajrang Power and Metallics Limited |
| Land area | 336.2 acres (136.1 ha) |
| Project cost | ₹1,275 crore |
| Village / locality | Sahaspur |
| Taluk / tehsil | Begunia |
| District | Khordha |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03263 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Jul 2026 (this page) | Environmental approval granted | 336.2 acres | ₹1,275 crore |
| Early planning filed 13 Feb 2026 | Cleared for impact study | 336.2 acres | ₹1,275 crore |
In context
9 applications in Khordha since January 2022 are in the same category (Industry): 5 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
Where it is
Sahaspur, Begunia, Khordha, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 40,000 TPA Titanium Dioxide Pigment plant by M/s. Shri Bajrang Power… — cleared for impact study, 0 m away
- Modification of Ec Applied for Semi-Mechanized Method of Mining As Per the… — environmental approval granted, 13.8 km away
- Fresh EC of Kusapalla Boulder Quarry over an area of 3.00 Acres or 1.214… — environmental approval granted, 13.8 km away
- Ramachandrapur Laterite Stone Quarry-2 Over an Area of 4.825acres Or 1.952 Ha… — not approved, 17 km away
- Application for Fresh Environmental Clearance for Talagadakuhudi Lsq-7 Over an… — initial checks, 19.3 km away
- Fresh EC of Brusabandha Black Stone Quarry No:- 5 over an area of 3.00 Acres… — lapsed, 19.6 km away
- Grant of Transfer Ec of Brusabandha Black Stone Quarry No-5 Over an Area 1.214… — environmental approval granted, 19.6 km away
- Brusabandha Black Stone Quarry No.-3, over an area of 4.50 acres or 1.822… — environmental approval granted, 19.6 km away
More from Shri Bajrang Power and Metallics Limited in Khordha
- Proposed Industrial Building having total built up area 1,20,397.81 sqm over… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.