Quick answers
What is this project?
Submission of Replenishment Study Report for the FY 2025-26 of Basingi Sand Bed over an area of 12.35 acres or 4.99 hectares is a rejected mining project in Basingi, Bahalda, Mayurbhanj, Odisha. The site covers 12.3 acres.
Who is building it?
The applicant is Blue Edge Trade Venture Private Limited.
Has it been approved?
No. The application was rejected on 25 Jun 2026.
Where is it?
In Basingi, Bahalda, Mayurbhanj, Odisha.
How big is it?
It has a stated cost of ₹5 lakh and a site of 12.3 acres.
When was it filed?
The application was filed on 16 Mar 2026.
Project details
| Official title | Submission of Replenishment Study Report for the FY 2025-26 of Basingi Sand Bed over an area of 12.35 acres or 4.99 hectares in village Basingi under Bahalda Tahasil in Mayurbhanj District, Odisha of M/s Blue Edge Trade Venture Pvt. Ltd. |
|---|---|
| Status | Not approved |
| Status since | 25 Jun 2026 |
| Application filed | 16 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Blue Edge Trade Venture Private Limited |
| Land area | 12.3 acres (5 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Basingi |
| Taluk / tehsil | Bahalda |
| District | Mayurbhanj |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03320 |
In context
150 applications in Mayurbhanj since January 2022 are in the same category (Mining): 74 approved, 15 filed or under review, and 61 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.3 acres, this one is smaller than 57% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Basingi, Bahalda, Mayurbhanj, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tentla-Kadamdiha Sand Bed Over an area of 12.30 Acres or 4.977 hectares — environmental approval granted, 1.8 km away
- Ghumal Sand Bed Over an Area of 12.35 Acres Or 4.99 Hectares — environmental approval granted, 2.4 km away
- Dalki Quartz & Quartzite Mine over 1.295 ha — environmental approval granted, 5.8 km away
- Dundughat Sand Bed Over an area of 12.35 Acres or 4.99 hectares — not approved, 5.9 km away
- Transfer of Environment Clearance of Badddundu Sand Bed-II over an area of… — environmental approval granted, 6.3 km away
- Badddundu Sand Bed-Ii Over an Area of 12.35 Acres Or 4.99 Hectares — environmental approval granted, 6.3 km away
- Dalki - 1 Quartz & Quartzite Mines over 3.845 ha — lapsed, 6.4 km away
- Proposed "Khadkhai Medium Irrigation Project (Phase – II)" on Khadkhai river… — under environmental review, 7 km away
All 3 Blue Edge Trade Venture projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.