Quick answers
What is this project?
Application of Environmental Clearance for Production of 1.080 Kld Mahua Flower Based Out Still Country Liquor Manufacturing Unit of M/S Telkoi Main Out Still Liquor Shop is an approved industrial project in Telkoi, Kendujhar, Odisha. The site covers 0.5 acres.
Who is building it?
The applicant is KAHNUCHARAN SAHu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Nov 2026), as of 27 Nov 2026.
Where is it?
In Telkoi, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹12 lakh and a site of 0.5 acres.
When was it filed?
The application was filed on 11 Sept 2026.
Project details
| Official title | Application of Environmental Clearance for Production of 1.080 Kld Mahua Flower Based Out Still Country Liquor Manufacturing Unit of M/S Telkoi Main Out Still Liquor Shop at Village-Telkoi, Tahasil-Telkoi, District- Kendujhar in Favor of Sri Kahnu Charan Sahu |
|---|---|
| Status | Environmental approval granted |
| Status since | 20 Nov 2026 |
| Application filed | 11 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | KAHNUCHARAN SAHu |
| Land area | 2,000 m² |
| Project cost | ₹12 lakh |
| Village / locality | Telkoi |
| Taluk / tehsil | Telkoi |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03342 |
In context
38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.5 acres, this one is smaller than 89% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Telkoi, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Establishment of 2.48 MTPA (throughput) Coal… — under environmental review, 2.6 km away
- Extension of Environmental Clearance for Benidihi (West) Stone Quarry over an… — environmental approval granted, 12.5 km away
- Benidihi (West) Stone Quarry Over an Area of 8.500 Acres Or 3.440 Hectares — not approved, 12.5 km away
- Preliminary Exploration for Bauxite and Associated Critical and Trace Elements… — forest land use approved, 17.7 km away
- Critical Mineral Assessment Programme (CMAP) for for assessing the… — forest land use approved, 18.1 km away
- Preliminary Exploration for Bauxite and Associated Critical Elements in… — forest land use approved, 20.1 km away
- Ramial Left Bank Pumped Storage Project (1500 MW) — cleared for impact study, 20.7 km away
- Critical Mineral Assessment Programme (CMAP) for assessing the potentiality of… — forest land use approved, 22.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.