Quick answers
What is this project?
Proposed production of 4,00,000 TPA MS-Billets through 6 X 20 Tons Induction Furnace, 2 X 30 Tons LRF by M/s Siddhiriddhi International Private Limited is a proposed industrial project in N>Upada, Kendujhar Sadar, Kendujhar, Odisha. The site covers 60 acres.
Who is building it?
The applicant is M/S Siddhiriddhi International Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In N>Upada, Kendujhar Sadar, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹98.5 crore and a site of 60 acres.
When was it filed?
The application was filed on 18 Feb 2026.
Project details
| Official title | Proposed production of 4,00,000 TPA MS-Billets through 6 X 20 Tons Induction Furnace, 2 X 30 Tons LRF along with CCM 2 x 2 strand, 6/11 radius, and production of 3,88,350 TPA Rolled products by installing Rolling Mills of 2 x 25 TPH capacity and Reheating Furnace of 2 X 30 TPH (emergency use) and slag crushing unit of 1 X 15 TPH at village – Salarapenth, Tehsil – Keonjhar Sadar, District – Keonjhar, Odisha by M/s Siddhiriddhi International Private Limited. |
|---|---|
| Status | Returned to applicant |
| Status since | 3 Jul 2026 |
| Application filed | 18 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/S Siddhiriddhi International Private Limited |
| Land area | 60 acres (24.3 ha) |
| Project cost | ₹98.5 crore |
| Village / locality | N>Upada |
| Taluk / tehsil | Kendujhar Sadar |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03495 |
In context
38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 60 acres, this one is smaller than 74% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
N>Upada, Kendujhar Sadar, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for reappraisal of DEIAA Keonjhar granted EC at SEIAA of Nitigotha… — environmental approval granted, 1.8 km away
- Application for reappraisal of DEIAA Keonjhar granted EC at SEIAA of Nitigotha… — not approved, 1.8 km away
- Greenfield Project of Capacity 20,00,000 TPA (throughput) Iron Ore… — returned to applicant, 2.3 km away
- Greenfield Project of Capacity 20,00,000 TPA (throughput) Iron Ore… — cleared for impact study, 2.3 km away
- Greenfield Project of Capacity 20,00,000 TPA (throughput) Iron Ore… — returned to applicant, 2.3 km away
- Gadhanmardan Iron Ore Mine to Goaldih New BG Railway Line — lapsed, 2.6 km away
- Greenfield Project of Capacity 20,00,000 TPA (throughput) Iron Ore… — environmental approval granted, 2.9 km away
- Diversion of 2.048 Ha Forest area involved for construction of 33 kV… — more information requested, 2.9 km away
More from M/S Siddhiriddhi International Private Limited in Kendujhar
- Greenfield Project of Capacity 20,00,000 TPA (throughput) Iron Ore… — environmental approval granted
- Greenfield Project of Capacity 20,00,000 TPA (throughput) Iron Ore… — returned to applicant
- Greenfield Project of Capacity 20,00,000 TPA (throughput) Iron Ore… — cleared for impact study
- Greenfield Project of Capacity 20,00,000 TPA (throughput) Iron Ore… — returned to applicant
All 5 Siddhiriddhi International projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.