Greenfield project comprising of establishment of Coal Washery (Wet type) – 3.0 MTPA (throughput capacity), AFBC Power Plant – 1 x 50 MW & Brick Manufacturing unit – 60,000 Bricks/day

Greenfield project comprising of establishment of Coal Washery (Wet type) – 3.0 MTPA (throughput capacity), AFBC Power Plant – 1 x 50 MW & Brick Manufacturing unit – 60,000 Bricks/day is a withdrawn mining project in Jarapara, Jarapada, Anugul, Odisha. The site covers 149.8 acres. Its stated project cost is ₹400 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 8 May 2026).

See it on the live map All projects in Anugul

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield project comprising of establishment of Coal Washery (Wet type) – 3.0 MTPA (throughput capacity), AFBC Power Plant – 1 x 50 MW & Brick Manufacturing unit – 60,000 Bricks/day is a withdrawn mining project in Jarapara, Jarapada, Anugul, Odisha. The site covers 149.8 acres.

Who is building it?

The applicant is Atlas Energy and Resources Private Limited.

Has it been approved?

No. The application was withdrawn on 8 May 2026, so it is no longer under consideration.

Where is it?

In Jarapara, Jarapada, Anugul, Odisha.

How big is it?

It has a stated cost of ₹400 crore and a site of 149.8 acres.

When was it filed?

The application was filed on 8 May 2026.

Project details

StatusWithdrawn
Status since8 May 2026
Application filed8 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAtlas Energy and Resources Private Limited
Land area149.8 acres (60.6 ha)
Project cost₹400 crore
Village / localityJarapara
Taluk / tehsilJarapada
DistrictAnugul
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-03559

In context

108 applications in Anugul since January 2022 are in the same category (Mining): 50 approved, 25 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 149.8 acres, this one is smaller than 52% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Jarapara, Jarapada, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Atlas Energy and Resources Private Limited in Anugul

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.