Not approvedIndustry · Jajapur, Odisha

Expansion in Production of Existing Coke Oven Plant (3 X 20,000 Tpa I.E. 60,000 Tpa) by Addition of 2 Nos. New Coke Oven (2 X 24,000 Tpa I.E. 48,000 Tpa) to Final Capacity of 1,08,000 Tpa Low Ash Metallurgical Coke Production Within the Existing Premises of M/S Nilachal Carbo Metalicks LTD. at Baramana, Purunabaulamala, Post: Jenapur

Expansion in Production of Existing Coke Oven Plant (3 X 20,000 Tpa I.E. 60,000 Tpa) by Addition of 2 Nos. New Coke Oven (2 X 24,000 Tpa I.E. 48,000 Tpa) to Final Capacity of 1,08,000 Tpa Low Ash Metallurgical Coke Production Within the Existing Premises of M/S Nilachal Carbo Metalicks LTD. at Baramana, Purunabaulamala, Post: Jenapur is a rejected industrial project in Baraman, Jenapur, Jajapur, Odisha. The site covers 10.4 acres. Its stated project cost is ₹23.3 crore. As of 27 Nov 2026, its status is “Not approved” (since 10 Nov 2026).

See it on the live map All projects in Jajapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleExpansion in Production of Existing Coke Oven Plant (3 X 20,000 Tpa I.E. 60,000 Tpa) by Addition of 2 Nos. New Coke Oven (2 X 24,000 Tpa I.E. 48,000 Tpa) to Final Capacity of 1,08,000 Tpa Low Ash Metallurgical Coke Production Within the Existing Premises of M/S Nilachal Carbo Metalicks LTD. at Baramana, Purunabaulamala, Post: Jenapur, in the District of Jajpur, Odisha
StatusNot approved
Status since10 Nov 2026
Application filed19 Aug 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantNilachal Carbo Metalicks Limited
Land area10.4 acres (4.2 ha)
Project cost₹23.3 crore
Village / localityBaraman
Taluk / tehsilJenapur
DistrictJajapur
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-03692

In context

56 applications in Jajapur since January 2022 are in the same category (Industry): 27 approved, 15 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10.4 acres, this one is smaller than 95% of them.

33 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Baraman, Jenapur, Jajapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.