Project details
| Official title | Proposed expansion from 900 TPM Coal Tar Pitch, Light Creosote Oil, Heavy Creosote Oil, Anthracene Oil and 2000 TPM Liquid Coal Tar Pitch to 5500 TPM coal Tar Pitch, 4000 TPM Creosote Oil & Anthracene Oil, 500 TPM Naphthalene (Crude and Processed) and 2000 TPM Liquid Coal Tar at Village – Jayantpur, Tahasil – Jujumura, District – Sambalpur, Odisha by M/s Agrawal Rasayan |
|---|---|
| Status | Cleared for impact study |
| Status since | 20 Aug 2026 |
| Application filed | 14 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Agrawal Rasayan |
| Land area | 10.3 acres (4.2 ha) |
| Project cost | ₹23.3 crore |
| Village / locality | Jaintpur |
| Taluk / tehsil | Sadar |
| District | Sambalpur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03714 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 14 Jul 2026 (this page) | Cleared for impact study | 10.3 acres | ₹23.3 crore |
| Early planning filed 24 Feb 2026 | Under environmental review | 4.7 acres | ₹23.3 crore |
In context
38 applications in Sambalpur since January 2022 are in the same category (Industry): 17 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10.3 acres, this one is smaller than 82% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jaintpur, Sadar, Sambalpur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion from 900 TPM Coal Tar Pitch, Light Creosote Oil, Heavy… — under environmental review, 0 m away
- Greenfield Project of "Grain Based Distillery Plant of 120 KLD by M/s… — environmental approval granted, 4.9 km away
- Economic Corridors, Inter Corridors and Feeder Routes to improve the… — environmental approval granted, 5.3 km away
- Economic Corridors, Inter Corridors and Feeder Routes to improve the… — cleared for impact study, 5.3 km away
- Application for Fresh Environmental Clearance for Dudkakud Stone Quarry-1 Over… — environmental approval granted, 5.7 km away
- Environmental Clearance for Production of Country Liquor From the… — under environmental review, 6.5 km away
- Environment Clearance of Balalanga Stone Quarry-B (Plot No. 1192, Khata No.69)… — not approved, 7 km away
- Environment Clearance of Balalanga Stone Quarry-C , Plot No.808, 845(P), 817,… — lapsed, 7.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.