Expansion of Chrome Ore Beneficiation Plant of Throughput Capacity From 18,500 Tpa to 3,60,000 Tpa and Installation of 2 X 12 Mva Submerged Arc Furnace, 6 X 5 Mva Electric Arc Furnace for Production of High, Low & Medium Carbon Ferro Chrome, Ferro Manganese, Silico Chrome, Silico Manganese, Ferro Molybdenum, Ferro Vanadium & Ferro Titanium (Total Production Capacity of Fap -115000 Tpa)

Expansion of Chrome Ore Beneficiation Plant of Throughput Capacity From 18,500 Tpa to 3,60,000 Tpa and Installation of 2 X 12 Mva Submerged Arc Furnace, 6 X 5 Mva Electric Arc Furnace for Production of High, Low & Medium Carbon Ferro Chrome, Ferro Manganese, Silico Chrome, Silico Manganese, Ferro Molybdenum, Ferro Vanadium & Ferro Titanium (Total Production Capacity of Fap -115000 Tpa) is a lapsed industrial project in Jaminibindha, Bhandari Pokhari, Bhadrak, Odisha. The site covers 11.1 acres. Its stated project cost is ₹75 crore. As of 27 Nov 2026, its status is “Lapsed” (since 8 Nov 2026).

See it on the live map All projects in Bhadrak

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Chrome Ore Beneficiation Plant of Throughput Capacity From 18,500 Tpa to…

Project details

StatusLapsed
Status since8 Nov 2026
Application filed15 May 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantShree Monolithics Private Limited
Land area11.1 acres (4.5 ha)
Project cost₹75 crore
Village / localityJaminibindha
Taluk / tehsilBhandari Pokhari
DistrictBhadrak
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-03731

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 15 May 2026 (this page)Lapsed11.1 acres₹75 crore
Early planning filed 18 Jan 2025Cleared for impact study11.1 acres₹75 crore

In context

8 applications in Bhadrak since January 2022 are in the same category (Industry): 3 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jaminibindha, Bhandari Pokhari, Bhadrak, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.