What is Developing? Open the mapMap

Environmental approval grantedIndustry · Ganjam, Odisha

Validity extension of environmental Clearance (EC) for production of 1.0 KLD Mahua Flower based country liquor manufacturing unit M/s Durbandha Main Out Still Liquor Shop

Validity extension of environmental Clearance (EC) for production of 1.0 KLD Mahua Flower based country liquor manufacturing unit M/s Durbandha Main Out Still Liquor Shop is an approved industrial project in Godarapalli, Hinjili, Ganjam, Odisha. The site covers 1 acre. Its stated project cost is ₹15 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 22 Jul 2026).

See it on the live map All projects in Ganjam

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Validity extension of environmental Clearance (EC) for production of 1.0 KLD Mahua Flower based country liquor manufacturing unit M/s Durbandha Main Out Still Liquor Shop is an approved industrial project in Godarapalli, Hinjili, Ganjam, Odisha. The site covers 1 acre.

Who is building it?

The applicant is Salma Khan.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 22 Jul 2026), as of 27 Nov 2026.

Where is it?

In Godarapalli, Hinjili, Ganjam, Odisha.

How big is it?

It has a stated cost of ₹15 lakh and a site of 1 acre.

When was it filed?

The application was filed on 24 Jun 2026.

Project details

Official titleProposal for validity extension of environmental Clearance (EC) for production of 1.0 KLD Mahua Flower based country liquor manufacturing unit M/s Durbandha Main Out Still Liquor Shop in village- Kanchuru, Tahasil- Hinjilicut, Dis- Ganjam in favour of Smt Salma Khan.
StatusEnvironmental approval granted
Status since22 Jul 2026
Application filed24 Jun 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorIndustry
ApplicantSalma Khan
Land area4,000 m²
Project cost₹15 lakh
Village / localityGodarapalli
Taluk / tehsilHinjili
DistrictGanjam
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-03769

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Validity extension filed 24 Jun 2026 (this page)Environmental approval granted1 acre₹15 lakh
Validity extension filed 22 Aug 2025Environmental approval granted1 acre₹15 lakh

In context

188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is larger than 84% of them.

Where it is

Godarapalli, Hinjili, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.