Quick answers
What is this project?
Production of 3.792 Kld Mahua Flower Based Out Still Country Liquor Manufacturing Unit of Polasara Main Out Still Liquor Shop, At- Hatibadi, Tahasil- Polasara, District- Ganjam of Licensee Sri Ardhendu Sundar Sahu is an approved industrial project in Hatibari, Kabisuryanagar, Ganjam, Odisha. The site covers 1 acre.
Who is building it?
The applicant is Ardhendu Sahu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Jun 2026), as of 27 Nov 2026.
Where is it?
In Hatibari, Kabisuryanagar, Ganjam, Odisha.
How big is it?
It has a stated cost of ₹20 lakh and a site of 1 acre.
When was it filed?
The application was filed on 2 May 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Jun 2026 |
| Application filed | 2 May 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Ardhendu Sahu |
| Land area | 4,000 m² |
| Project cost | ₹20 lakh |
| Village / locality | Hatibari |
| Taluk / tehsil | Kabisuryanagar |
| District | Ganjam |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03782 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 2 May 2026 (this page) | Environmental approval granted | 1 acre | ₹20 lakh |
| Validity extension filed 24 May 2025 | Environmental approval granted | 1 acre | ₹20 lakh |
| Validity extension filed 3 Aug 2024 | Environmental approval granted | 1 acre | ₹20 lakh |
In context
188 applications in Ganjam since January 2022 are in the same category (Industry): 153 approved, 9 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is larger than 84% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hatibari, Kabisuryanagar, Ganjam, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Production of 3.792 Kld Mahua Flower Based Out Still Country Liquor… — environmental approval granted, 0 m away
- Production of 3.792 Kld Mahua Flower Based Out Still Country Liquor… — environmental approval granted, 0 m away
- Mathura Stone Quarry over an area of 10.875 acres or 4.401 hectares having… — environmental approval granted, 1.8 km away
- Mathura Stone Quarry over an area of 10.875 acres or 4.401 hectares having… — environmental approval granted, 1.8 km away
- Extension of validity of Environmental Clearance for Production of 1.896 KLD… — not approved, 2.9 km away
- Mardarajpur Stone Quarry over an area of 19.180 acres or 7.762 hectares having… — cleared for impact study, 3.8 km away
- Jakar Stone Quarry-2 over an area of 40.781 acres or 16.503 hectares bearing… — cleared for impact study, 6.8 km away
- Jakar Stone Quarry — lapsed, 7.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.