Project details
| Official title | Proposed Installation of 1.0 MTPA (throughput) Iron Ore Beneficiation Plant, alongside the existing 60 TPH iron ore crushing and 120 TPH screening plant of M/s Vidya Minerals Pvt. Ltd. located at Arkaikela, PO: Tumkela, Dist.- Sundargarh, Odisha . |
|---|---|
| Status | Cleared for impact study |
| Status since | 25 Jun 2026 |
| Application filed | 29 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vidya Minerals Private Limited |
| Land area | 11.5 acres (4.7 ha) |
| Project cost | ₹35 crore |
| Village / locality | Arkeikela |
| Taluk / tehsil | Banei |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03800 |
In context
310 applications in Sundargarh since January 2022 are in the same category (Mining): 161 approved, 55 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.5 acres, this one is smaller than 82% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 19.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Arkeikela, Banei, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Iron Ore Beneficiation Plant of Capacity 12,00,000 TPA (Throughput) at San… — under environmental review, 300 m away
- Expansion of existing 66,000 TPA Sponge Iron unit to proposed final capacity… — lapsed, 800 m away
- Optimization and modification in EC configuration from 3x12 T IF to 2x20T IF;… — initial checks, 900 m away
- For obtaining Stage-I clearance for capacity enhancement of Sponge Iron Plant… — more information requested, 1000 m away
- Reconsideration of the EC Application for Deogaon-II Sand Quarry over an Area… — not approved, 1.4 km away
- Grant of EC of DEOGAON-II SAND BED over an area 12.35Ac or 5.00Hc — not approved, 1.4 km away
- Extension of validity of EC of Narendra Sand Bed-2 over an area of 19.80 acres… — environmental approval granted, 2.8 km away
- Narendra Sand Bed - 2 (Area - 8.012 ha.) — environmental approval granted, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.