Quick answers
What is this project?
New Proposal for Fresh Ec of Karlasoda Stone Quarry Over an Area 3.751 Ha Or 9.270 Ac Village Karlsoda Kalahandi Tahasil and District Odisha is a proposed mining project in Karlasoda, Sadar, Kalahandi, Odisha. The site covers 9.3 acres.
Who is building it?
The applicant is G D Mining Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Karlasoda, Sadar, Kalahandi, Odisha.
How big is it?
It has a stated cost of ₹20 lakh and a site of 9.3 acres.
When was it filed?
The application was filed on 18 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 25 May 2026 |
| Application filed | 18 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | G D Mining Private Limited |
| Land area | 9.3 acres (3.8 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Karlasoda |
| Taluk / tehsil | Sadar |
| District | Kalahandi |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03931 |
In context
155 applications in Kalahandi since January 2022 are in the same category (Mining): 90 approved, 16 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.3 acres, this one is smaller than 55% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Karlasoda, Sadar, Kalahandi, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance of Sapsilet Sand Bed over an Area of 12.20… — not approved, 5.2 km away
- Extension of Environmental clearance Turkel-I Sand Quarry over an area of… — environmental approval granted, 5.4 km away
- Amendment of Ec for Turkel-I Sand Bed Is — not approved, 5.4 km away
- Amendment of Ec for Turkel-I Sand Bed Is — not approved, 5.4 km away
- Fresh EC of Turkel Sand Quarry-2 over an area of 12.35 Acres or 5.00 Ha having… — environmental approval granted, 5.4 km away
- Fresh EC of Turkel Sand Quarry-1 over an area of 12.36 Acres or 5.00 Ha having… — environmental approval granted, 5.4 km away
- Fresh EC of Turkel Sand Quarry-2 over an area of 12.35 Acres or 5.00 Ha having… — withdrawn, 5.4 km away
- Fresh EC of Turkel Sand Quarry-1 over an area of 12.36 Acres or 5.00 Ha having… — withdrawn, 5.4 km away
All 33 G D Mining projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.