Project details
| Official title | PROPOSAL FOR DIVERSION OF 2.981 HA. FOREST LAND FOR CONSTRUCTION OF 33 KV OVERHEAD TRANSMISSION LINE FROM 33 KV SWITCHYARD AT KANTHER-KOIRA TO PROPOSED 33/11 KV SUB-STATION AT CHANDIPOSHI IRON ORE BLOCK OF M/s RUNGTA MINES LIMITED IN VILLAGE- SARGIGADA UNDER KOIRA TAHASIL OF SUNDARGARH DISTRICT, ODISHA. |
|---|---|
| Status | More information requested |
| Status since | 6 Aug 2026 |
| Application filed | 14 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Rungta Mines LTD |
| Land area | 7.4 acres (3 ha) |
| Forest land | 7.4 acres (3 ha) |
| Project cost | ₹8 crore |
| Village / locality | Koida (Ct) |
| Taluk / tehsil | Koida |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04039 |
In context
13 applications in Sundargarh since January 2022 are in the same category (Power): 6 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.4 acres, this one is smaller than 100% of them.
39 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Koida (Ct), Koida, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for proposed 12 MTPA (3 nos x 3 MTPA + 2 nos x 1.5… — environmental approval granted, 850 m away
- Environmental Clearance for proposed 12 MTPA (3 nos x 3 MTPA + 2 nos x 1.5… — cleared for impact study, 850 m away
- Bhanjikusum Manganese Ore Mine — more information requested, 1.3 km away
- Proposed 8,00,000 TPA (Throughput) Iron Ore Beneficiation plant, at: Village-… — under environmental review, 1.3 km away
- Proposed 8,00,000 TPA (Throughput) Iron Ore Beneficiation plant, at: Village-… — cleared for impact study, 1.3 km away
- Enhancement in Production of Manganese Ore From 6000tpa to 70063 Tpa From the… — cleared for impact study, 1.4 km away
- Manganese Ore beneficiation plant with 19800 TPA throughput capacity at Vill:… — environmental approval granted, 1.4 km away
- Diversion of 3.119 Ha Forest Land for Construction of Approach Road and… — more information requested, 1.6 km away
More from Rungta Mines LTD in Sundargarh
- Diversion of 3.495 ha forest land for construction of Link road connecting… — lapsed
- Environment Clearance for Kedesala North East Iron Ore Block for production of… — environmental approval granted
- Environment Clearance of Proposed G+3 Rungta Residential colony Kula for… — environmental approval granted
- Kamanda Steel Plant Of Rungta Mines Limited — initial checks
- Diversion of 100.797 Ha.(100.439 Ha Lease Area + 0.358 Ha. for Connecting Road… — in-principle approval, conditions pending
- Environment Clearance for Kedesala North East Iron Ore Block for production of… — cleared for impact study
14 Rungta Mines projects in Sundargarh
All 41 Rungta Mines projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.