What is Developing? Open the mapMap

LapsedMining · Mayurbhanj, Odisha

Preliminary Exploration for Copper and Associated Precious Metal Mineralisation in Dudhiasol West Block, Mayurbhanj District, Odisha (G3).

Preliminary Exploration for Copper and Associated Precious Metal Mineralisation in Dudhiasol West Block, Mayurbhanj District, Odisha (G3) is a lapsed mining project in Gauddiha, Bangiriposi, Mayurbhanj, Odisha. The site covers 494.2 acres. Its stated project cost is ₹15 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 31 May 2026).

See it on the live map All projects in Mayurbhanj

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Preliminary Exploration for Copper and Associated Precious Metal Mineralisation in Dudhiasol West Block, Mayurbhanj District, Odisha (G3) is a lapsed mining project in Gauddiha, Bangiriposi, Mayurbhanj, Odisha. The site covers 494.2 acres.

Who is building it?

The applicant is Geological Survey of INDIA, Ministry of Mines.

Has it been approved?

No. The application was lapsed on 31 May 2026, so it is no longer under consideration.

Where is it?

In Gauddiha, Bangiriposi, Mayurbhanj, Odisha.

How big is it?

It has a stated cost of ₹15 lakh; a site of 494.2 acres and 338.4 acres (136.9 ha) of forest land.

When was it filed?

The application was filed on 15 Oct 2025.

Project details

StatusLapsed
Status since31 May 2026
Application filed15 Oct 2025
Approval soughtForest land use
Application typeNew project
SectorMining
ApplicantGeological Survey of INDIA, Ministry of Mines
Land area494.2 acres (200 ha)
Forest land338.4 acres (136.9 ha)
Project cost₹15 lakh
Village / localityGauddiha
Taluk / tehsilBangiriposi
DistrictMayurbhanj
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-04231

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 15 Oct 2025 (this page)Lapsed494.2 acres₹15 lakh
New project filed 26 May 2025Lapsed494.2 acres₹15 lakh

In context

150 applications in Mayurbhanj since January 2022 are in the same category (Mining): 74 approved, 15 filed or under review, and 61 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 494.2 acres, this one is larger than 97% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Gauddiha, Bangiriposi, Mayurbhanj, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Geological Survey of INDIA, Ministry of Mines in Mayurbhanj

11 Geological Survey of India (GSI) projects in Mayurbhanj
All 170 Geological Survey of India (GSI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.