What is Developing? Open the mapMap

Forest land use approvedPipelines · Kendujhar, Odisha

Water Pipeline Project Which Includes Water Intake Well, Underground Water Pipeline and Electrical Power Cable From Karo River to Existing Karakhendra Steel Plant of M/S Rungta Mines LTD

Water Pipeline Project Which Includes Water Intake Well, Underground Water Pipeline and Electrical Power Cable From Karo River to Existing Karakhendra Steel Plant of M/S Rungta Mines LTD is an approved pipeline project in Hayarpur, Barbil, Kendujhar, Odisha. The site covers 3.6 acres. Its stated project cost is ₹20 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 23 Apr 2026).

See it on the live map All projects in Kendujhar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Water Pipeline Project Which Includes Water Intake Well, Underground Water Pipeline and Electrical Power Cable From Karo River to Existing Karakhendra Steel Plant of M/S Rungta Mines LTD is an approved pipeline project in Hayarpur, Barbil, Kendujhar, Odisha. The site covers 3.6 acres.

Who is building it?

The applicant is Rungta Mines LTD.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 23 Apr 2026), as of 27 Nov 2026.

Where is it?

In Hayarpur, Barbil, Kendujhar, Odisha.

How big is it?

It has a stated cost of ₹20 crore; a site of 3.6 acres and 1.6 acres (0.7 ha) of forest land.

When was it filed?

The application was filed on 30 Sept 2022.

Project details

StatusForest land use approved
Status since23 Apr 2026
Application filed30 Sept 2022
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantRungta Mines LTD
Land area3.6 acres (1.5 ha)
Forest land1.6 acres (0.7 ha)
Project cost₹20 crore
Village / localityHayarpur
Taluk / tehsilBarbil
DistrictKendujhar
StateOdisha
Location fromSite area on record
Our referenceWID-OR-04232

In context

11 applications in Kendujhar since January 2022 are in the same category (Pipelines): 1 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. At 3.6 acres, this one is smaller than 82% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hayarpur, Barbil, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Rungta Mines LTD in Kendujhar

6 Rungta Mines projects in Kendujhar
All 41 Rungta Mines projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.