Project details
| Official title | Installation of poles for Jio Fiber at Sunabeda, Michapali, Sialati, Soseng and Sunabeda GP for 0.05 Hectare |
|---|---|
| Status | More information requested |
| Status since | 20 Nov 2023 |
| Application filed | 20 Nov 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Sudhir Pradhan |
| Land area | 500 m² |
| Project cost | ₹30 lakh |
| Village / locality | Sialati |
| Taluk / tehsil | Komna |
| District | Nuapada |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04580 |
In context
5 applications in Nuapada since January 2022 are in the same category (Other): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sialati, Komna, Nuapada, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road From Chareichuankhol–khaligaon–haluapali– Soseng Under Komna Tahasil,… — under wildlife review, 1.9 km away
- Road from Jamgaon to Soseng via Gudma — under wildlife review, 3.2 km away
- Laying of OFC from Batibahal to Litibahal to Deosil — more information requested, 3.5 km away
- Maintenance of the Road & Cd Works Mmsy for the Road Cherichuan Ultimately… — more information requested, 4.8 km away
- Maintenance of the Road & Cd Works Mmsy for the Road Cherichuan Ultimately… — more information requested, 4.8 km away
- Maintenance of the Road & Cd Works Under Mmsy for the Road Biju Expressway… — lapsed, 5.6 km away
- Road from Sunabeda to Adra–Soseng — under wildlife review, 6.9 km away
- Maintenance of the Road & Cd Works Under Mukhya Mantri Sadak Yojana for the… — more information requested, 6.9 km away
More from Sudhir Pradhan in Nuapada
- NOAN-MWR-8001 (Bhaosil) — lapsed
- Laying of OFC from Batibahal to Litibahal to Deosil — more information requested
- OFC laying (Deosil-Batibahal & Litibahal-Deosil) - 70 KM under Sunabeda WL… — lapsed
- USOF Project (NOAN-MWR-8001) — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.