Quick answers
What is this project?
Laying of Optical Fibre Cable OFC under 4G Saturation Project of DBN(erstwhile USOF), Govt. of India is a proposed telecom project in Forest, Thakurgarh, Anugul, Odisha. The site covers 0.2 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Forest, Thakurgarh, Anugul, Odisha.
How big is it?
It has a stated cost of ₹7 lakh and a site of 0.2 acres.
When was it filed?
The application was filed on 17 Mar 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 17 Mar 2026 |
| Application filed | 17 Mar 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 900 m² |
| Project cost | ₹7 lakh |
| Village / locality | Forest |
| Taluk / tehsil | Thakurgarh |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04704 |
In context
5 applications in Anugul since January 2022 are in the same category (Telecom): 0 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Forest, Thakurgarh, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying CWRM DI Pipes at road - Kenchuanali to Taranda — decision issued, 650 m away
- Improvement of Road and CD works of Pitabahal Chhak to Bipradihi via Taranda… — more information requested, 650 m away
- Diversion of 2.1 Ha of Forest Land for Construction of Pmgsy Road From… — lapsed, 2.1 km away
- Laying of Optical Fibre Cable (OFC) under 4G Saturation Project of USOF, Govt.… — more information requested, 2.7 km away
- Laying of Drinking water pipe in Maimura GP (Pitabalibahal to Kashinathapur)… — lapsed, 3.7 km away
- Laying of Drinking water pipe in Maimura GP under Mega PWS to 21 GPs of… — lapsed, 4.3 km away
- Over Head Reservoir at Gopinathpur under Mega PWS to 21 GPs of Athamallik Block — lapsed, 5 km away
- Zonal Pumping Station at Kantapada under Mega PWS to 21 GPs of Athamallik Block — lapsed, 6.1 km away
More from Mahesh Nair in Anugul
- Laying of Optical Fibre Cable (OFC) under 4G Saturation Project of USOF, Govt.… — more information requested
- Laying of Optical Fibre Cable (Ofc) Under 4g Saturation Project of Usof, Govt.… — decision issued
- Laying of Optical Fibre Cable(OFC) under 4G Saturation project of USOF, Govt.… — more information requested
- Laying of Optical Fibre Cable(OFC) under 4G Saturation project of USOF, Govt.… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.