Quick answers
What is this project?
Solar Panel With Bore Well Arrangement for 5 Villages ( Malipasi,saramundi Villages in K.Balipal Gp and Dalki,ratanmara & Pitanau Villages is a proposed building project in Baula Reserved Forest, Soso, Kendujhar, Odisha. The site covers 0.3 acres.
Who is building it?
The applicant is Rws & S Division, Anandapur.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Baula Reserved Forest, Soso, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹268.5 crore and a site of 0.3 acres.
When was it filed?
The application was filed on 11 Mar 2026.
Project details
| Official title | Installation of Solar Panel With Bore Well Arrangement for 5 Villages ( Malipasi,saramundi Villages in K.Balipal Gp and Dalki,ratanmara & Pitanau Villages in Hadagarh Gp)in Keonjhar District to Provide Safe Drinking Water to the Villages Under Rwss-Mega Pws to 200 Villages Under Hatadihi Block in Keonjhar District. |
|---|---|
| Status | More information requested |
| Status since | 11 Mar 2026 |
| Application filed | 11 Mar 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Rws & S Division, Anandapur |
| Land area | 1,200 m² |
| Project cost | ₹268.5 crore |
| Village / locality | Baula Reserved Forest |
| Taluk / tehsil | Soso |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04725 |
In context
9 applications in Kendujhar since January 2022 are in the same category (Buildings & townships): 1 approved, 5 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baula Reserved Forest, Soso, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mobile Tower for 4G Saturation Project under USOF of GOI — decision issued, 600 m away
- Implementation of Cage Culture — more information requested, 2.1 km away
- Improvement of Road From Malliposi to Sarat From Chainage- 0/0 Km to Chainage-… — lapsed, 5.4 km away
- Road From Chhatraghati to K. Balipal Road From Chainage 0/00 Km to Chainage… — lapsed, 7.8 km away
- Road From Chhatraghati to K. Balipal Road From Chainage 0/00 Km to Chainage… — more information requested, 7.8 km away
- Integrated Anandapur Barrage Project — forest land use approved, 11.7 km away
- intergraded Anandapur Barrage Project — decision issued, 13.8 km away
- Baitarini Sand Bed, Talagaon Over an Area of 12.30 Acres Or 4.978 Hectares — environmental approval granted, 18.4 km away
More from Rws & S Division, Anandapur in Kendujhar
- Underground Laying of 11 KV Power Supply Line for the Mega Pws to 81 Nos. of… — more information requested
- Underground Laying of 11 KV Power Supply Line for the Mega Pws to 81 Nos. of… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.