Quick answers
What is this project?
DIVERSION OF FOREST LAND OVER 0.021 HA FOR LAYING OF PIPELINE FOR DRAWL OF SALINE WATER FROM Bay of Bengal to EXISTING J.B.S. AQUATICS is a lapsed pipeline project in Mithakua, Krushna Prasad, Puri, Odisha. The site covers 37.9 acres.
Who is building it?
The applicant is Balunkeswar Biswal.
Has it been approved?
No. The application was lapsed on 17 Dec 2024, so it is no longer under consideration.
Where is it?
In Mithakua, Krushna Prasad, Puri, Odisha.
How big is it?
It has a stated cost of ₹34 lakh and a site of 37.9 acres.
When was it filed?
The application was filed on 24 Apr 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: DIVERSION OF FOREST LAND OVER 0.021 HA FOR LAYING OF PIPELINE FOR DRAWL OF SALINE WATER…
Project details
| Official title | PROPOSAL FOR DIVERSION OF FOREST LAND OVER 0.021 HA FOR LAYING OF PIPELINE FOR DRAWL OF SALINE WATER FROM Bay of Bengal to EXISTING J.B.S. AQUATICS |
|---|---|
| Status | Lapsed |
| Status since | 17 Dec 2024 |
| Application filed | 24 Apr 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Balunkeswar Biswal |
| Land area | 37.9 acres (15.3 ha) |
| Project cost | ₹34 lakh |
| Village / locality | Mithakua |
| Taluk / tehsil | Krushna Prasad |
| District | Puri |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04754 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Aug 2024 | In-principle approval, conditions pending | 0 acres | ₹34 lakh |
| New project filed 24 Apr 2024 (this page) | Lapsed | 37.9 acres | ₹34 lakh |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mithakua, Krushna Prasad, Puri, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- DIVERSION OF FOREST LAND OVER 0.021 HA FOR LAYING OF PIPELINE FOR DRAWL OF… — in-principle approval, conditions pending, 100 m away
- Krushnaprasad Heavy Minerals Mine — more information requested, 3.6 km away
- Laying of Pipeline from sea (Bay of Bengal) to existing Abhaya Aqua Hatchery — lapsed, 10.6 km away
- Laying of Pipeline from sea (Bay of Bengal) to existing Abhaya Aqua Hatchery — in-principle approval, conditions pending, 10.8 km away
- Project Name- Construction of Missing Link Over Chilika Lake Between Satpada… — cleared for impact study, 19.7 km away
- Improvement of Passenger Jetty at Mahensha in Chilika Lake under Krushnaprasad… — under coastal review, 20 km away
- Improvement of Passenger Jetty at Brahmapur in Chilika Lake under… — coastal clearance granted, 20.9 km away
- Camp office of Chilika Development Authority at Satapada, Puri District — lapsed, 22.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.