Quick answers
What is this project?
Expansion of the existing steel manufacturing unit namely "M/s Devbhoomi Casting Pvt. Ltd." for increasing the production capacity from 84 TPD (29,400 TPA) to 288 TPD (1,00,800 TPA) located at Transport Nagar, Village Kumbra, Mandi Gobindgarh, Distt. Fatehgarh Sahib, Punjab is an approved industrial project in Kumbhra (40), Amloh, Fatehgarh Sahib, Punjab. The site covers 5.2 acres.
Who is building it?
The applicant is M/S Devbhoomi Casting PVT. LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Nov 2023), as of 27 Nov 2026.
Where is it?
In Kumbhra (40), Amloh, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹25 crore and a site of 5.2 acres.
When was it filed?
The application was filed on 16 Nov 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | M/S Devbhoomi Casting PVT. LTD. |
| Land area | 5.2 acres (2.1 ha) |
| Project cost | ₹25 crore |
| Village / locality | Kumbhra (40) |
| Taluk / tehsil | Amloh |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00017 |
In context
85 applications in Fatehgarh Sahib since January 2022 are in the same category (Industry): 70 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.2 acres, this one is larger than 54% of them.
80 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kumbhra (40), Amloh, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of the existing Steel Manufacturing Unit namely M/s Shree Ram… — environmental approval granted, 550 m away
- Expansion of the existing Steel Manufacturing Unit namely M/s Shree Ram… — more information requested, 550 m away
- Expansion of existing Steel Manufacturing Unit namely M/s Durga Multimetals… — environmental approval granted, 800 m away
- Expansion of existing Steel Manufacturing Unit namely M/s Durga Multimetals… — cleared for impact study, 800 m away
- New Steel Manufacturing Unit M/s BR Chopra Multimetals Private Limited — environmental approval granted, 900 m away
- New Steel Manufacturing Unit M/s BR Chopra Multimetals Private Limited — cleared for impact study, 900 m away
- New Steel Manufacturing Unit M/s BR Chopra Multimetals Private Limited — environmental approval granted, 900 m away
- Amendment in the Ec Granted Vide Letter No. Ec24b008pb131478 Dated 01.01.2024… — environmental approval granted, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.