Quick answers
What is this project?
Proposed New Steel Manufacturing unit by M/s Vaneera Industries Ltd is an approved industrial project in Kadon, Payal, Ludhiana, Punjab. The site covers 5.3 acres.
Who is building it?
The applicant is Vaneera Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Apr 2024), as of 27 Nov 2026.
Where is it?
In Kadon, Payal, Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹25 crore and a site of 5.3 acres.
When was it filed?
The application was filed on 9 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Apr 2024 |
| Application filed | 9 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Vaneera Industries Limited |
| Land area | 5.3 acres (2.1 ha) |
| Project cost | ₹25 crore |
| Village / locality | Kadon |
| Taluk / tehsil | Payal |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00047 |
In context
98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.3 acres, this one is smaller than 55% of them.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kadon, Payal, Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Bless Green Steel Private Limited — more information requested, 1.3 km away
- Retail Outlet of Nayara Energy Limited — lapsed, 1.6 km away
- PROPOSED ROLLING MILL UNIT BY M/s ARORA IRON AND STEEL ROLLING MILLS (P)… — environmental approval granted, 1.8 km away
- PROPOSED ROLLING MILL UNIT BY M/s ARORA IRON AND STEEL ROLLING MILLS (P)… — environmental approval granted, 1.8 km away
- Industrial project by Arora Iron & Steel Rolling Mills Private Limited — lapsed, 1.8 km away
- "M/S Vishakha Steel & Power LLP" — more information requested, 1.9 km away
- Proposed Steel Manufacturing Unit namely M/s Vishakha Steel & Power LLP — cleared for impact study, 2 km away
- Industrial project by M/s Ludhiana Steel Rolling Mills Limited — environmental approval granted, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.