Quick answers
What is this project?
Proposed 0.75 Million Tonnes Per Annum (MTPA) Crude Steel Production Through EAF at Industrial Plot A-1, Kadiana Khurd Village (Adjacent to Hi-Tech Cycle Valley), Ludhiana East Tehsil, Ludhiana District, Punjab-Tata Steel Limited is an approved industrial project in Kariana Khurd (55), Ludhiana (East), Ludhiana, Punjab. The site covers 437.2 acres.
Who is building it?
The applicant is Tata Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Jun 2023), as of 27 Nov 2026.
Where is it?
In Kariana Khurd (55), Ludhiana (East), Ludhiana, Punjab.
How big is it?
It has a stated cost of ₹2,590 crore and a site of 437.2 acres.
When was it filed?
The application was filed on 8 Jun 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Jun 2023 |
| Application filed | 8 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Tata Steel Limited |
| Land area | 437.2 acres (176.9 ha) |
| Project cost | ₹2,590 crore |
| Village / locality | Kariana Khurd (55) |
| Taluk / tehsil | Ludhiana (East) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00058 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jun 2023 (this page) | Environmental approval granted | 437.2 acres | ₹2,590 crore |
| Early planning filed 6 Oct 2022 | Cleared for impact study | 329.1 acres | ₹2,590 crore |
In context
98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 437.2 acres, this one is larger than 99% of them.
Where it is
Kariana Khurd (55), Ludhiana (East), Ludhiana, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 0.75 Million Tonnes Per Annum (MTPA) Crude Steel Production Through… — cleared for impact study, 48.9 km away
- Steel Manufacturing Unit namely M/s Varun Steel Castings Pvt. Ltd — environmental approval granted, 53.4 km away
- Expansion in existing steel manufacturing unit having by M/s P.V. Industries — lapsed, 53.4 km away
- Expansion in existing steel manufacturing unit having by M/s P.V. Industries — cleared for impact study, 53.5 km away
- Amendment in the Ec Vide No. Decc/Seiaa/2020/1601 Dated 20.05.2020 and Ec Vide… — environmental approval granted, 53.8 km away
- Road project by M/S Hoshiarpur Automobiles — more information requested, 54.2 km away
- "Golds Walk" of "M/S Gold Land Infratech" — initial checks, 54.6 km away
- Diversion of 0.0197 Ha. of Forest land for approach road to Private Property… — under forest review, 54.7 km away