Quick answers
What is this project?
Expansion in the existing steel manufacturing unit M/s P.S. Alloys & Metals is a proposed industrial project in Kumbh, Amloh, Fatehgarh Sahib, Punjab. The site covers 3.6 acres.
Who is building it?
The applicant is P S Alloys & Metals.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 8 Apr 2023), as of 27 Nov 2026.
Where is it?
In Kumbh, Amloh, Fatehgarh Sahib, Punjab.
How big is it?
It has a stated cost of ₹21.1 crore and a site of 3.6 acres.
When was it filed?
The application was filed on 8 Apr 2023.
Project details
| Official title | Expansion in the existing steel manufacturing unit M/s P.S. Alloys & Metals at Village- Kumbh, Mandi Gobindgarh, Tehsil- Amloh, District- Fatehgarh Sahib, Punjab |
|---|---|
| Status | Cleared for impact study |
| Status since | 8 Apr 2023 |
| Application filed | 8 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | P S Alloys & Metals |
| Land area | 3.6 acres (1.5 ha) |
| Project cost | ₹21.1 crore |
| Village / locality | Kumbh |
| Taluk / tehsil | Amloh |
| District | Fatehgarh Sahib |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00082 |
In context
85 applications in Fatehgarh Sahib since January 2022 are in the same category (Industry): 70 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.6 acres, this one is smaller than 73% of them.
81 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kumbh, Amloh, Fatehgarh Sahib, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in the existing steel manufacturing unit namely M/s P.S. Alloys &… — environmental approval granted, 0 m away
- Existing Steel Manufacturing Unit namely Hind Alloys for increasing production… — environmental approval granted, 150 m away
- Expansion of the existing Steel Manufacturing Unit namely "M/s P.P Castings" — environmental approval granted, 500 m away
- Permission for construction of approach Access to M/S Rosha Alloys Pvt Ltd — forest land use approved, 550 m away
- Expansion of existing Steel Manufacturing Unit M/s Rosha Alloys Pvt. Ltd — environmental approval granted, 550 m away
- Existing Steel Manufacturing Unit namely M/s Bharat Steel Industry — cleared for impact study, 700 m away
- Expansion in the existing Steel Manufacturing unit M/s ANJ Metal Recycling… — environmental approval granted, 750 m away
- Expansion of existing Steel Manufacturing Unit M/s Shree Ganesh Alloys — environmental approval granted, 800 m away
More from P S Alloys & Metals in Fatehgarh Sahib
- Expansion in the existing steel manufacturing unit namely M/s P.S. Alloys &… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.